Permit: T21CM03940
Permit Details
Apply Date:
05/10/2021
Applicant:
Ray Sharp
Description:
T17CM04256 has expired. Per Juan Garcia, Assistant Building Official, a new permit is required
Permit Reviews
Permit Number - T21CM03940
Permit Status: Complete
Permit Description: T17CM04256 has expired. Per Juan Garcia, Assistant Building Official, a new permit is required
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/10/2021 | COMMERCIAL - NEW | 07/15/2021 | COMPLETED |
| 10/25/2021 | RESUBMITTAL | 10/29/2021 | COMPLETED |
| 11/30/2021 | RESUBMITTAL | 12/06/2021 | COMPLETED |
| 12/16/2021 | RESUBMITTAL | 01/21/2022 | COMPLETED |
| 06/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/11/2024 | APPROVED |
| 06/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM03940
Permit Status: Complete
Permit Description: T17CM04256 has expired. Per Juan Garcia, Assistant Building Official, a new permit is required
| Date | Description | Comments |
|---|---|---|
| 06/04/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 06/04/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 06/04/2024 | Engineer Rene Flores changed from bolted connections to embed steel plates into the masonry. See Letter from him dated 5/16/22 | |
| 06/04/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03940
Permite Description: T17CM04256 has expired. Per Juan Garcia, Assistant Building Official, a new permit is required
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2022 | COT - LCBU - Masonry Pregrout | N/A | Partial Pass | partial approval for first lift ok to place grout |
| 05/03/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | |
| 05/03/2024 | COT - LCBU - Sustainability | N/A | Not Applicable | |
| 05/03/2024 | COT - LCPL - Gas Pressure Test | N/A | Not Applicable | |
| 05/03/2024 | COT - LCPL - Medical Gas/Test | N/A | Not Applicable | |
| 05/03/2024 | COT - LCBU - Building Final | N/A | Not Ready | 5/3/24: not ready |
| 10/26/2022 | COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03940
Permit Description: T17CM04256 has expired. Per Juan Garcia, Assistant Building Official, a new permit is required
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2022 | COT - LCPL - Rough Soil | Passed | {Activity date: 05/02/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by VVERA1 - Approved. Ok to cover progress areas.} | |
| 06/29/2022 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved, okay for concrete placement} ; {Activity date: 06/14/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. South footing and west footing completed, 1/4th ofNorth wall complete.} | |
| 06/29/2022 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 06/29/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved} | |
| 02/06/2023 | COT - LCBU - Masonry Pregrout | Passed | top of cmu walls | |
| 05/01/2023 | COT - LCBU - Roof Nailing | Passed | Roof sheathing is properly installed and nailed off. Crickets and roof scuppers are installed. Okay to apply roofing material. | |
| 05/01/2023 | COT - LCPL - Plumbing Roof Drains | Passed | Roof sheathing is properly installed and nailed off. Crickets and roof scuppers are installed. Okay to apply roofing material. | |
| 05/10/2023 | COT - LCEL - Electrical Underground | Passed | Future electrical and communications conduits are installed 24" below finished floor. Okay to backfill and compact for pouring of concrete floor slab. | |
| 12/08/2023 | COT - LCBU - Preslab | Passed | Rear canopy area, OK to install wire mesh and place concrete in progress areas. | |
| 03/01/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
| 03/01/2024 | COT - LCBU - Framing | Passed | Ok to insulate and Sheetrock restrooms. | |
| 03/05/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 03/05/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
| 03/05/2024 | COT - LCEL - Temporary Service | Passed | ||
| 03/05/2024 | COT - LCEL - Construction Power | Passed | ||
| 05/03/2024 | COT - LCBU - Building Progress | Passed | ||
| 05/03/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
| 05/03/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
| 05/03/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 05/29/2024 | COT - LCBU - Building Final | Passed | ||
| 05/29/2024 | COT - LCEL - Electrical Final | Passed | ||
| 05/29/2024 | COT - FCON - Fire - Final | Passed |