Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1101 S VAN BUREN AV
Apply Date:
05/03/2021
Applicant:
Lisa Bowers
Description:
New Residential Care Facility

Permit Reviews

Permit Number - T21CM03689
Permit Status: Complete
Permit Description: New Residential Care Facility
Start Date Submittal Complete Date Status  
06/01/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 06/02/2021 COMPLETED Review Details
07/20/2021 RESUBMITTAL 08/10/2021 COMPLETED Review Details
03/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/17/2025 APPROVED Review Details
02/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T21CM03689
Permit Status: Complete
Permit Description: New Residential Care Facility
Date Description Comments
02/28/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED for concrete mix.
02/28/2025 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
02/28/2025 SPECIAL INSPECTION FOR INSULATING CONCRETE FILL IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
02/28/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM03689
Permite Description: New Residential Care Facility
Total Outstanding Inspections - 19
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSEL - Temporary Service N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSBU - Sustainability N/A Not Ready
02/02/2023 COT - RSPL - Sewer N/A Re-inspection required identify which units are to be inspected. Call for a rough soil inspection (sewer is outside the building).
Install a open stack at least 5 feet tall for a soil test on each building full of water.
03/06/2023 COT - RSBU - Preslab N/A Re-inspection required 3-6-23: Install ufers at both slabs.
07/16/2024 RSEL - Electrical Progress N/A Re-inspection required 1-Install backing for grab bars in Unit 1.
2-Install boxes for exterior lights.
3-Fill in holes near plumbing in Units.
10/26/2022 COT - RSEL - Grounding/Bonding N/A Not Ready
10/26/2022 COT - LCBU - Building Above Ceiling N/A Not Ready
02/20/2025 COT - RSME - Mechanical Final N/A Re-inspection required 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O.
10/26/2022 COT - RSBU - Stem Wall/Retaining Wall N/A Not Ready
02/20/2025 COT - RSEL - Outdoor Lighting N/A Re-inspection required 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O.
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
02/20/2025 COT - RSBU - Masonry Pregrout N/A Re-inspection required 2-20-25, see previous inspection notes.
02/20/2025 RSBU - Building Final N/A Re-inspection required 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O.
02/20/2025 COT - RSPL - Plumbing Final N/A Re-inspection required 2-20-25, paint all exterior plastics to include abs on roof tops, cleanouts, and condensate lines. Also, unit 10 is missing dishwasher/hammer arrestor, grab bars on shower/behind and on side of water closet, and flush control handle must be on accessible side of water closet.
02/20/2025 COT - LCBU - CofO N/A Re-inspection required 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O.
02/20/2025 COT - RSEL - Electrical Final N/A Re-inspection required 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O.
COT - FCON - Fire - Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM03689
Permit Description: New Residential Care Facility
Total Completed Inspections - 27
Date Description Inspector Results Comments
02/03/2023 COT - RSPL - Rough Soil Passed units 1 thru 4 rough soil ok to cover
10/18/2023 COT - RSBU - Roof Nailing Passed Roofing for 10 units is properly nailed off. Okay to proceed with roofing material installation.
05/23/2024 COT - LCPL - Plumbing Intermediate Passed
07/23/2024 RSPL - Plumbing Progress Passed
07/23/2024 COT - RSBU - Preslab Passed
10/18/2024 RSBU - Building Progress Passed
12/19/2024 BULD - Electrical Clearance Passed ECO
02/20/2025 COT - RSEL - Electrical Underground Passed 2-20-25, previously inspected and approved.
02/20/2025 COT - LCBU - Framing Passed 2-20-25, previously inspected and approved
02/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2-20-25, previously inspected and approved
02/20/2025 RSEL - Electrical Progress Passed
02/20/2025 COT - RSPL - Yard Water Line Passed 2-20-25, approved.
04/23/2025 COT - RSEL - Grounding/Bonding Passed
04/23/2025 COT - LCBU - Building Above Ceiling Passed
04/23/2025 COT - RSME - Mechanical Final Passed
04/23/2025 COT - RSBU - Stem Wall/Retaining Wall Passed
04/23/2025 COT - RSEL - Outdoor Lighting Passed
04/23/2025 RSME - Mechanical Progress Passed
04/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/23/2025 COT - RSBU - Masonry Pregrout Passed
05/06/2025 RSBU - Building Final Passed
05/06/2025 COT - RSPL - Plumbing Final Passed
05/06/2025 COT - LCBU - CofO Passed
05/06/2025 COT - RSEL - Electrical Final Passed
05/06/2025 COT - FCON - Fire - Final Passed
05/06/2025 COT - FCON - Alarm - Final Passed
05/06/2025 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PERMIT T21CM03689-SIC FINAL-2025-03-06_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTIONS-2025-03-06_V2.PDF DOCUMENTS VIEW
R78741506.J2302962A_V1.PDF DOCUMENTS VIEW
R78741556.J2302962B_V1.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
COMCHECK_1.PDF DOCUMENTS VIEW
COMCHECK.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
PLAN CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
LOT COMBO FORM SIGNED.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW