Permit: T21CM03689
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1101 S VAN BUREN AV
Address NEW:
1101 S VAN BUREN AV
Apply Date:
05/03/2021
Applicant:
Lisa Bowers
Description:
New Residential Care Facility
Permit Reviews
Permit Number - T21CM03689
Permit Status: Complete
Permit Description: New Residential Care Facility
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 06/02/2021 | COMPLETED |
| 07/20/2021 | RESUBMITTAL | 08/10/2021 | COMPLETED |
| 03/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/17/2025 | APPROVED |
| 02/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/04/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - T21CM03689
Permit Status: Complete
Permit Description: New Residential Care Facility
| Date | Description | Comments |
|---|---|---|
| 02/28/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED for concrete mix. | |
| 02/28/2025 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
| 02/28/2025 | SPECIAL INSPECTION FOR INSULATING CONCRETE FILL IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 02/28/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 02/28/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T21CM03689
Permite Description: New Residential Care Facility
Total Outstanding Inspections - 19
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSEL - Temporary Service | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Sustainability | N/A | Not Ready | |
| 02/02/2023 | COT - RSPL - Sewer | N/A | Re-inspection required | identify which units are to be inspected. Call for a rough soil inspection (sewer is outside the building). Install a open stack at least 5 feet tall for a soil test on each building full of water. |
| 03/06/2023 | COT - RSBU - Preslab | N/A | Re-inspection required | 3-6-23: Install ufers at both slabs. |
| 07/16/2024 | RSEL - Electrical Progress | N/A | Re-inspection required | 1-Install backing for grab bars in Unit 1. 2-Install boxes for exterior lights. 3-Fill in holes near plumbing in Units. |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
| 02/20/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. |
| 10/26/2022 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Ready | |
| 02/20/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 02/20/2025 | COT - RSBU - Masonry Pregrout | N/A | Re-inspection required | 2-20-25, see previous inspection notes. |
| 02/20/2025 | RSBU - Building Final | N/A | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. |
| 02/20/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 2-20-25, paint all exterior plastics to include abs on roof tops, cleanouts, and condensate lines. Also, unit 10 is missing dishwasher/hammer arrestor, grab bars on shower/behind and on side of water closet, and flush control handle must be on accessible side of water closet. |
| 02/20/2025 | COT - LCBU - CofO | N/A | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. |
| 02/20/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. |
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| COT - FCON - Sprinkler - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T21CM03689
Permit Description: New Residential Care Facility
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2023 | COT - RSPL - Rough Soil | Passed | units 1 thru 4 rough soil ok to cover | |
| 10/18/2023 | COT - RSBU - Roof Nailing | Passed | Roofing for 10 units is properly nailed off. Okay to proceed with roofing material installation. | |
| 05/23/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 07/23/2024 | RSPL - Plumbing Progress | Passed | ||
| 07/23/2024 | COT - RSBU - Preslab | Passed | ||
| 10/18/2024 | RSBU - Building Progress | Passed | ||
| 12/19/2024 | BULD - Electrical Clearance | Passed | ECO | |
| 02/20/2025 | COT - RSEL - Electrical Underground | Passed | 2-20-25, previously inspected and approved. | |
| 02/20/2025 | COT - LCBU - Framing | Passed | 2-20-25, previously inspected and approved | |
| 02/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2-20-25, previously inspected and approved | |
| 02/20/2025 | RSEL - Electrical Progress | Passed | ||
| 02/20/2025 | COT - RSPL - Yard Water Line | Passed | 2-20-25, approved. | |
| 04/23/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/23/2025 | COT - LCBU - Building Above Ceiling | Passed | ||
| 04/23/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/23/2025 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 04/23/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/23/2025 | RSME - Mechanical Progress | Passed | ||
| 04/23/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/23/2025 | COT - RSBU - Masonry Pregrout | Passed | ||
| 05/06/2025 | RSBU - Building Final | Passed | ||
| 05/06/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/06/2025 | COT - LCBU - CofO | Passed | ||
| 05/06/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/06/2025 | COT - FCON - Fire - Final | Passed | ||
| 05/06/2025 | COT - FCON - Alarm - Final | Passed | ||
| 05/06/2025 | COT - FCON - Sprinkler - Final | Passed |