Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | Not Ready | ||
| 08/04/2021 | COT - RSPL - Plumbing Final | RSHERRY | Prior to Final Inspectn | Entered by RSHERRY1 - WATER DISINFECTION REPORT REQUIRED |
| 02/03/2023 | COT - RSPL - Plumbing Final | Not Ready | ||
| 02/20/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 2-20-25, paint all exterior plastics to include abs on roof tops, cleanouts, and condensate lines. Also, unit 10 is missing dishwasher/hammer arrestor, grab bars on shower/behind and on side of water closet, and flush control handle must be on accessible side of water closet. | |
| 04/23/2025 | COT - RSPL - Plumbing Final | Re-inspection required | 2-20-25, label breakers at main main panel, install smoke detector in living room for unit 6, paint all exterior plastic (condensate lines/exterior cleanouts)together with plastic on roof tops,install weather resistant receptacles on exterior outlets, provide landscaping per approved plans, remove plastic coverings from smoke detectors in all units, install dishwasher/hammer arrestor in unit 10, install grab bars for unit 10 on shower and toilets, flush control handle must be on accessible side of water closet. Refer to your pending "conditions" and start addressing requirements to further progress for Cof O. 4/23/25: Panel schedules must be appropriately labeled (mislabeled throughout), GFCI receptacles required (under kitchen sink, laundry room,), WR GFCI receptacles required at exterior receptacles, open knockouts at mini split disconnect boxes must be sealed, remove all covers from smoke detectors, smoke detector in unit 10 not installed. |
|
| 05/06/2025 | COT - RSPL - Plumbing Final | Passed |