Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Sewer | Not Ready | ||
| 04/12/2022 | COT - RSPL - Sewer | DQUINN | Approved | Entered by NGARCIA3 - Ap All exterior pvc drains, for this multiple tiny home project, ok to back fill to lateral hcs connection. |
| 04/11/2022 | COT - RSPL - Sewer | WGALLAGHER | Not ready for Inspection | Entered by NGARCIA3 - Not ready |
| 04/08/2022 | COT - RSPL - Sewer | RCHANDLER | Cancelled | Entered by NGARCIA3 - CA per phone call with contractor. |
| 09/02/2022 | COT - RSPL - Sewer | RCHANDLER | Approved | Entered by VVERA1 - Approved |
| 02/02/2023 | COT - RSPL - Sewer | Re-inspection required | identify which units are to be inspected. Call for a rough soil inspection (sewer is outside the building). Install a open stack at least 5 feet tall for a soil test on each building full of water. |