Permit: T21CM03036
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2614 N LA VERNE AV
Address NEW:
2614 N LA VERNE AV
Apply Date:
04/08/2021
Applicant:
Description:
ENCLOSE PATIO - BEDROOM & BATHROOM
Permit Reviews
Permit Number - T21CM03036
Permit Status: Inspections
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2021 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 04/29/2021 | COMPLETED |
| 04/29/2021 | RESUBMITTAL | 05/11/2021 | COMPLETED |
| 05/11/2021 | RESUBMITTAL | 05/13/2021 | COMPLETED |
| 09/21/2022 | REVISION - - 1ST | 09/21/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T21CM03036
Permit Status: Inspections
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/15/2021 | FUP T21OT00298 MUST BE PAID BEFORE FINAL INSPECTIONS. |
| 07/27/2023 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. |
| 10/02/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: T21CM03036
Permite Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | customer was advised to remove insulation and drywall to expose framing and all electrical and plumbing and recall for intermediates prior to doing a electrical clearance on the new panel. The sub panel is improperly installed and must all wiring needs to be in place so that when the cut over is done, they will not be without power inside their existing house and the addition, so please wire branch circuits. |
| 09/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSBU - Preslab | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSPL - Rough Soil | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | RSBU - Building Final | N/A | Re-inspection required | Provide approved plans. |
| 09/18/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | Provide approved plans. |
Completed Inspections
Permit Status: Inspections
Permit Number: T21CM03036
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2021 | COT - LCBU - Framing | Passed | {Activity date: 10/14/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Partial Frame ok prior to intermediates and rough plumb.} |
|
| 10/20/2022 | COT - BULD - SWG Clearance | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - CODE GAS} | |
| 10/20/2022 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP. SWG clearance. } ; {Activity date: 10/12/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -DE: Test not holding.} |
|
| 07/15/2026 | BULD - Electrical Clearance | Passed | Previous inspector notes have not yet been addressed. Additional items include: seal all penetrations through top plate HVAC ducts must be secured every 4 feet Relieve cinch/choke points created at ductwork by waterlines, gas lines, and improper angles Inspection stopped, site not ready, re walk and correct all notes current and previous as listed by inspectors. |