Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address NEW:
2614 N LA VERNE AV
Apply Date:
04/08/2021
Applicant:
Description:
ENCLOSE PATIO - BEDROOM & BATHROOM

Permit Reviews

Permit Number - T21CM03036
Permit Status: Inspections
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Start Date Submittal Complete Date Status  
04/08/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 04/29/2021 COMPLETED Review Details
04/29/2021 RESUBMITTAL 05/11/2021 COMPLETED Review Details
05/11/2021 RESUBMITTAL 05/13/2021 COMPLETED Review Details
09/21/2022 REVISION - - 1ST 09/21/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T21CM03036
Permit Status: Inspections
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Outstanding Activity Conditions - 3
Date Name
04/15/2021 FUP T21OT00298 MUST BE PAID BEFORE FINAL INSPECTIONS.
07/27/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/02/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: T21CM03036
Permite Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
06/21/2023 BULD - Electrical Clearance N/A Re-inspection required customer was advised to remove insulation and drywall to expose framing and all electrical and plumbing and recall for intermediates prior to doing a electrical clearance on the new panel. The sub panel is improperly installed and must all wiring needs to be in place so that when the cut over is done, they will not be without power inside their existing house and the addition, so please wire branch circuits.
09/18/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSBU - Preslab N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSPL - Rough Soil N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSEL - Outdoor Lighting N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSEL - Electrical Final N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSME - Mechanical Final N/A Re-inspection required Provide approved plans.
09/18/2026 RSBU - Building Final N/A Re-inspection required Provide approved plans.
09/18/2026 COT - RSPL - Plumbing Final N/A Re-inspection required Provide approved plans.

Completed Inspections

Permit Status: Inspections
Permit Number: T21CM03036
Permit Description: ENCLOSE PATIO - BEDROOM & BATHROOM
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/14/2021 COT - LCBU - Framing Passed {Activity date: 10/14/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - Partial
Frame ok prior to intermediates and rough plumb.}
10/20/2022 COT - BULD - SWG Clearance Passed {Activity date: 10/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - CODE GAS}
10/20/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 10/20/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP. SWG clearance.

} ; {Activity date: 10/12/2022; Status: Denied; Inspector: RCHANDLER; Comment: Entered by VVERA1 - -DE: Test not holding.}
07/15/2026 BULD - Electrical Clearance Passed Previous inspector notes have not yet been addressed.
Additional items include: seal all penetrations through top plate
HVAC ducts must be secured every 4 feet
Relieve cinch/choke points created at ductwork by waterlines, gas lines, and improper angles
Inspection stopped, site not ready, re walk and correct all notes current and previous as listed by inspectors.

Documents

File Name Document Type  
REV1 PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
REV1 PLAN.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW