Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSBU - Preslab | Not Ready | ||
| 06/20/2023 | COT - RSBU - Preslab | Re-inspection required | 6-20-23: Room has been started at South end of house around electrical service without a permit; concrete floor is installed, framing is in place, roof is covered, walls are insulated and some drywall has been installed. Customer wanted a clearance for electrocuted over. 1-Obtain revision for work in progress. 2- Remove concrete to allow connection of Grounding Electrode Conductor to Ufer. 3- Connect Grounding Electrode Conductor to Ufer. |