Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | Not Ready | ||
| 06/20/2023 | COT - RSPL - Plumbing Final | Re-inspection required | 6-20-23: Room has been started at South end of house around electrical service without a permit; concrete floor is installed, framing is in place, roof is covered, walls are insulated and some drywall has been installed. Customer wanted a clearance for electrocuted over. 1-Obtain revision for work in progress. 2- Remove concrete to allow connection of Grounding Electrode Conductor to Ufer. 3- Connect Grounding Electrode Conductor to Ufer. |
|
| 09/18/2026 | COT - RSPL - Plumbing Final | Re-inspection required | Provide approved plans. | |
| 09/24/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 09/24/2026 Water heater requires t&p valve to be piped down using copper or CPVC as well as sediment trap, black iron gas line stub does not have working gauge. |
|
| 09/30/2026 | COT - RSPL - Plumbing Final | Partial Pass | Partial pass for gas line, ok to connect appliances |