Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
|
BULD - Electrical Clearance |
|
Re-inspection required |
customer was advised to remove insulation and drywall to expose framing and all electrical and plumbing and recall for intermediates prior to doing a electrical clearance on the new panel. The sub panel is improperly installed and must all wiring needs to be in place so that when the cut over is done, they will not be without power inside their existing house and the addition, so please wire branch circuits. |