Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2156 E EDISON ST
Address NEW:
2156 E EDISON ST
Apply Date:
12/28/2020
Applicant:
Description:
SFR Addition and Garage Repair

Permit Reviews

Permit Number - T20CM09082
Permit Status: Issued
Permit Description: SFR Addition and Garage Repair
Start Date Submittal Complete Date Status  
02/23/2021 RESUBMITTAL 03/18/2021 COMPLETED Review Details
05/11/2021 RESUBMITTAL 06/01/2021 COMPLETED Review Details
08/05/2021 RESUBMITTAL 08/17/2021 COMPLETED Review Details
12/28/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 02/05/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM09082
Permit Status: Issued
Permit Description: SFR Addition and Garage Repair
Total Outstanding Activity Conditions - 2
Date Name
08/17/2021 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
08/17/2021 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Issued
Permit Number: T20CM09082
Permite Description: SFR Addition and Garage Repair
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
11/23/2021 COT - RSBU - Preslab N/A Canceled {Activity date: 11/23/2021; Status: Not Applicable; Inspector: TGAUSP; Comment: Entered by VVERA1 - NA, framed floor} ; {Activity date: 11/22/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 11/19/2021; Status: Not Applicable; Inspector: DQUINN; Comment: Entered by VVERA1 - na
No slab. Floor joists on stem.}
10/26/2022 COT - RSEL - Service Upgrade N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
01/09/2023 COT - RSPL - Plumbing Final N/A Re-inspection required Install hammer arrest or at dishwasher.
01/09/2023 RSBU - Building Final N/A Re-inspection required Install landings at exterior doors.

Completed Inspections

Permit Status: Issued
Permit Number: T20CM09082
Permit Description: SFR Addition and Garage Repair
Total Completed Inspections - 15
Date Description Inspector Results Comments
11/23/2021 COT - RSBU - Masonry Pregrout Passed {Activity date: 11/23/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by VVERA1 - Approved for CMU stem walls, okay to grout}
12/28/2021 COT - RSPL - Rough Soil Passed {Activity date: 12/28/2021; Status: Approved; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Approved for under floor and tie into existing sewer line, okay to backfill}
04/25/2022 COT - RSBU - Roof Nailing Passed {Activity date: 04/25/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by NGARCIA3 - Approved}
05/05/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 05/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
05/05/2022 COT - LCBU - Framing Passed {Activity date: 05/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 12/28/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial for sub-floor framing, okay the cover}
05/05/2022 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed {Activity date: 05/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
05/05/2022 RSME - Mechanical Progress Passed {Activity date: 05/05/2022; Status: Approved; Inspector: JBURGE; Comment: Entered by NGARCIA3 - Approved}
06/16/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 06/16/2022; Status: Approved; Inspector: DQUINN; Comment: Entered by NGARCIA3 - CODE INCR}
11/09/2022 COT - RSME - Mechanical Final Passed
11/09/2022 COT - RSEL - Outdoor Lighting Passed
11/09/2022 COT - RSEL - Service Upgrade Passed
11/09/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
01/09/2023 COT - RSEL - Electrical Final Passed
01/31/2023 COT - RSPL - Plumbing Final Passed corrections were made
01/31/2023 RSBU - Building Final Passed corrections were made

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
D.D.O. DOCUMENTS DRAWINGS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
DDO DECISION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
DDO PROJECT DESCRIPTION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
MECHANICAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUCTURAL CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
D.D.O. DOCUMENTS + DRAWINGS.PDF DOCUMENTS VIEW
DDO DECISION.PDF DOCUMENTS VIEW
DDO PROJECT DESCRIPTION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
MECHANICAL CALCS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW