Permit: T20CM05882
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
11390 E RITA RD
Address NEW:
11390 E RITA RD
Apply Date:
09/03/2020
Applicant:
Brian Stahl
Description:
PC-NEW RESIDENCE AND SEPTIC SYSTEM
Permit Reviews
Permit Number - T20CM05882
Permit Status: Complete
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/24/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 09/29/2020 | COMPLETED |
| 09/29/2020 | RESUBMITTAL | 10/08/2020 | COMPLETED |
| 10/26/2020 | RESUBMITTAL | 11/16/2020 | COMPLETED |
| 11/16/2020 | RESUBMITTAL | 11/24/2020 | COMPLETED |
Conditions
Permit Number - T20CM05882
Permit Status: Complete
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
| Date | Description | Comments |
|---|---|---|
| 09/03/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/01/2020 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 10/01/2020 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 10/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM05882
Permite Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - RSPL - Yard Water Line | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 10/26/2022 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/27/2022 | COT - LCBU - Framing | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM05882
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2021 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 05/04/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 04/30/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PA. All is good, except missing Ufer connection; Contractor will text pictures when done} | |
| 11/12/2021 | COT - RSPL - Rough Soil | Passed | {Activity date: 11/12/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 12/02/2021 | COT - RSBU - Preslab | Passed | {Activity date: 12/02/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP} | |
| 07/07/2022 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP Gable walls grouted} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - . PA Ok to grout walls to 9 foot. Clean outs at 4 foot high at all vertical reinforced cells for 1st lift. 3rd party special inspector required on site for all grout lifts. } |
|
| 08/17/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/11/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - NR 1. Provide the engineered truss calcs 2. Provide a 300lb rated extension ladder to access the attic 3. Staple the loose plans together 4. Call in for a 1035 FRAMING inspection & 1030 ROOF NAILING} |
|
| 12/27/2022 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/27/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/05/2023 | COT - LCBU - Framing | Passed | ||
| 05/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/18/2023 | RSBU - Building Progress | Passed | ||
| 10/18/2023 | COT - RSBU - Interior Shear Bracing | Passed | 10/18/23: all gypboard approved to tape. | |
| 10/11/2024 | COT - RSEL - Electrical Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | RSBU - Building Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSPL - Plumbing Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSME - Mechanical Final | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/11/2024 | COT - RSEL - Outdoor Lighting | Passed | 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy. |