Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
11390 E RITA RD
Address NEW:
11390 E RITA RD
Apply Date:
09/03/2020
Applicant:
Brian Stahl
Description:
PC-NEW RESIDENCE AND SEPTIC SYSTEM

Permit Reviews

Permit Number - T20CM05882
Permit Status: Complete
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Start Date Submittal Complete Date Status  
08/24/2020 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 09/29/2020 COMPLETED Review Details
09/29/2020 RESUBMITTAL 10/08/2020 COMPLETED Review Details
10/26/2020 RESUBMITTAL 11/16/2020 COMPLETED Review Details
11/16/2020 RESUBMITTAL 11/24/2020 COMPLETED Review Details

Conditions

Permit Number - T20CM05882
Permit Status: Complete
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Date Description Comments
09/03/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/01/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/01/2020 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/15/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: T20CM05882
Permite Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/27/2022 COT - LCBU - Framing N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T20CM05882
Permit Description: PC-NEW RESIDENCE AND SEPTIC SYSTEM
Total Completed Inspections - 16
Date Description Inspector Results Comments
05/04/2021 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 05/04/2021; Status: Approved; Inspector: RCHANDLER; Comment: Entered by RSALDAT1 - AP} ; {Activity date: 04/30/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PA. All is good, except missing Ufer connection; Contractor will text pictures when done}
11/12/2021 COT - RSPL - Rough Soil Passed {Activity date: 11/12/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
12/02/2021 COT - RSBU - Preslab Passed {Activity date: 12/02/2021; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - AP}
07/07/2022 COT - RSBU - Masonry Pregrout Passed {Activity date: 07/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
Gable walls grouted} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - . PA
Ok to grout walls to 9 foot. Clean outs at 4 foot high at all vertical reinforced cells for 1st lift. 3rd party special inspector required on site for all grout lifts.

}
08/17/2022 COT - RSBU - Roof Nailing Passed {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} ; {Activity date: 08/11/2022; Status: Not ready for Inspection; Inspector: TLUNDBERG; Comment: Entered by RSALDAT1 - NR
1. Provide the engineered truss calcs
2. Provide a 300lb rated extension ladder to access the attic
3. Staple the loose plans together
4. Call in for a 1035 FRAMING inspection & 1030 ROOF NAILING}
12/27/2022 COT - RSEL - Grounding/Bonding Passed
12/27/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
05/05/2023 COT - LCBU - Framing Passed
05/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/18/2023 RSBU - Building Progress Passed
10/18/2023 COT - RSBU - Interior Shear Bracing Passed 10/18/23: all gypboard approved to tape.
10/11/2024 COT - RSEL - Electrical Final Passed 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 RSBU - Building Final Passed 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSPL - Plumbing Final Passed 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSME - Mechanical Final Passed 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy.
10/11/2024 COT - RSEL - Outdoor Lighting Passed 10/11/24: Construction is complete per plans. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
ENGINEEREDTRUSSSTAMPED 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TRUSSLAYOUT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SIGNED-INITIALED-OWNERAFF_V1.PDF DOCUMENTS VIEW
ENGINEEREDTRUSSSTAMPED.PDF DOCUMENTS VIEW
TRUSSLAYOUT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
NOTARIZED LETTER.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
HEATING COOLING.PDF DOCUMENTS VIEW
ELECTRIC LOAD.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW