Inspection Status: Passed
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 10/18/2023 |
RSBU - Building Progress |
|
Passed |
|
| 12/22/2022 |
RSBU - Building Progress |
|
Not Ready |
met electrical contractor at site and informed him to remove all nonmetallic conduit in wall connected to metal boxes and run EMT, and all PEX in wall is required to be sleeved in metal conduit, or to furr out all walls with electric and plumbing in them. |