Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T20CM05882

Parcel: 205640660


Addresses:

11390 E RITA RD

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
02/24/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required
03/15/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Ground all metal boxes, support EMT in the wall, terminate romex into the panel, block top and bottom of upstairs walls, fill vents thru the roof, seal the top of furred out walls

March 15th: install windows, fill vents thru roof. OK to insulate and rock except around vents
05/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Ground all metal boxes, support EMT in the wall, terminate romex into the panel, block top and bottom of upstairs walls, fill vents thru the roof, seal the top of furred out walls

March 15th: install windows, fill vents thru roof. OK to insulate and rock except around vents

5/5/23: vents are empty
05/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed