Permit: T20CM05683
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2093 E LEE ST
Address NEW:
2093 E LEE ST
Apply Date:
08/30/2020
Applicant:
Alexander Anderson
Description:
SFR and Sleeping Quarters
Permit Reviews
Permit Number - T20CM05683
Permit Status: Complete
Permit Description: SFR and Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2021 | RESUBMITTAL | 03/26/2021 | COMPLETED |
| 05/03/2021 | REVISION - - 1ST | 05/05/2021 | COMPLETED |
| 07/23/2022 | REVISION - - 1ST | 08/02/2022 | COMPLETED |
| 08/05/2020 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/07/2020 | COMPLETED |
| 08/17/2022 | REVISION - - 1ST | 08/18/2022 | COMPLETED |
| 10/01/2020 | RESUBMITTAL | 11/03/2020 | COMPLETED |
| 10/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/16/2024 | APPROVED |
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/16/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T20CM05683
Permit Status: Complete
Permit Description: SFR and Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 08/30/2020 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/15/2020 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 07/25/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/14/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 10/11/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 10/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM05683
Permite Description: SFR and Sleeping Quarters
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2023 | RSPL - Plumbing Progress | N/A | Partial Pass | Partial pass. Pending DWV test. 5/31/2023 |
| 07/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | |
| 07/07/2023 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | |
| 07/07/2023 | BULD - Electrical Clearance | N/A | Re-inspection required | |
| 05/31/2023 | COT - RSEL - Construction Power | N/A | Canceled | Canceled per contractor. 5/31/2023 |
| 03/28/2023 | COT - RSPL - Plumbing Final | N/A | Partial Pass | 3-28-23: HCS connection and Casita intermediate. |
| 10/26/2022 | COT - RSPL - Rough Soil | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM05683
Permit Description: SFR and Sleeping Quarters
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2021 | COT - LCBU - Framing | Passed | {Activity date: 04/27/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - APPROVED OK TO INSULATE AND COVER WALLS} | |
| 08/18/2022 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 08/18/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
| 08/18/2022 | RSME - Mechanical Progress | Passed | {Activity date: 08/18/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } | |
| 11/08/2022 | COT - RSPL - Yard Water Line | Passed | ||
| 11/08/2022 | COT - RSEL - Electrical Underground | Passed | ||
| 12/08/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/08/2022 | COT - RSBU - Roof Nailing | Passed | ||
| 05/31/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/31/2023 | COT - RSPL - Sewer | Passed | ||
| 06/05/2023 | RSPL - Plumbing Progress | Passed | Waste lines are hydro tested | |
| 09/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/02/2023 | BULD - Electrical Clearance | Passed | Approved. Clearance for TEP ECO. 10/2/2023 | |
| 12/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/04/2024 | COT - RSEL - Electrical Final | Passed | ||
| 04/04/2024 | COT - RSME - Mechanical Final | Passed | ||
| 04/04/2024 | RSBU - Building Final | Passed | ||
| 04/04/2024 | COT - RSEL - Construction Power | Passed | Permanent power in place. | |
| 10/16/2024 | COT - RSPL - Plumbing Final | Passed | Passed on 12/28/2023 | |
| 10/16/2024 | COT - RSPL - Rough Soil | Passed | Under ground plumbing passed on 06/05/2023 | |
| 10/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Excavation passed on 11/08/2022 EWS |