Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
07/14/2020
Applicant:
Lisa Bowers
Description:
NEW BUILDING - TCO TO OCCUPY

Permit Reviews

Permit Number - T20CM04413
Permit Status: Expired
Permit Description: NEW BUILDING - TCO TO OCCUPY
Start Date Submittal Complete Date Status  
02/05/2021 RESUBMITTAL 02/16/2021 COMPLETED Review Details
07/14/2020 COMMERCIAL - NEW 10/20/2020 COMPLETED Review Details
10/20/2020 3RD PARTY REVIEW - COMMERCIAL 02/05/2021 COMPLETED Review Details
10/28/2021 REVISION - - 1ST 10/28/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM04413
Permit Status: Expired
Permit Description: NEW BUILDING - TCO TO OCCUPY
Total Outstanding Activity Conditions - 9
Date Name
02/05/2021 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
02/05/2021 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/05/2021 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/05/2021 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/05/2021 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/05/2021 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/05/2021 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
02/05/2021 SPECIAL INSPECTION IS REQUIRED FOR STRUCTURAL STEEL
07/14/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM04413
Permite Description: NEW BUILDING - TCO TO OCCUPY
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/14/2021 COT - LCEL - Temporary Service N/A Canceled {Activity date: 09/14/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Not Applicable.
}
11/07/2022 ENGR Engineering Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T20CM04413
Permit Description: NEW BUILDING - TCO TO OCCUPY
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/14/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 04/14/2021; Status: Approved; Inspector: DQUINN; Comment: Entered by VLEON1 - CODE ECO/BUILDING 46-MSGD} ; {Activity date: 03/31/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - CODE ECO}
09/14/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 07/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, Data hall above ceiling in Operations Building ok to close ceiling tiles. Fire Putty installed on boxes for office building elevator shaft.} ; {Activity date: 06/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection for following equipment complete. (FDC1, FDC2, FDC3).} ; {Activity date: 06/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, inspection for following panels complete. (CTC4A, CTC4B). Room 211.} ; {Activity date: 06/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection for terminations at following equipment complete. ( MDPU-1A, MDPU-1B, MDPU-2A, MDPU-2B, MDPU-3A, MDPU-3B, MDPU-4A, MDPU-4B, DSA, DSB, CTC-1, CLAN-1).

} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL DATA HALL CONNECTIONS} ; {Activity date: 05/26/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. North parking lot, conduits for car charging stations ( 4 each at 2 1/2”; 4 at 2”; 2 at 1”); light pole conduits at approximately 200’ with 4 each at 2”. Ok to cover progress areas.
} ; {Activity date: 05/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Exhaust fans installed on roof and disconnects inspected.} ; {Activity date: 05/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Lighting in soffit for connection entrance to OC ok to Sheetrock. Inspection of following equipment completed (Panel LH1, Panel RP-1A, Panel RP-3A, Panel LH1B, Panel RP1B, Panel RP-3B, Panel CLD, Panel CPHB1, Panel CPHB2, & Integrated Switchboard CLHA) ok to energize and lockout tag out circuits.

} ; {Activity date: 05/18/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for PDU breaker connections 1B-4B} ; {Activity date: 05/17/2021; Status: Not ready for Inspection; Inspector: DQUINN; Comment: Entered by VLEON1 - } ; {Activity date: 05/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection for following equipment for (Air Handler disconnects for 5A, 5B). UPS rooms (1A, 2A, 3A, 4A, 1B, 2B, 3B, 4B, CMDPB)} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Operation Building Electrical in walls complete for following rooms (5146, 5147, 5148, 5150, 5100, 5108, 5109, 5110, 5112, 5113, 5114, 5127A, 5136, 5134, 5130, 5227, 5216, 5226).} ; {Activity date: 05/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection for following equipment complete. 1st floor transformers ( RP3A, PHA, RP1A, RP1B, PHB, PR3B) second floor transformers and panel (RP2A, RP2B, LH2).} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Installation and Inspection for following Electrical equipment complete. (Panel CHPA1, Panel CHPA2, AHU-2A, AHU-2B, CPU-A, CPU-B, CPU-C, CMDPA) Electrical in walls and ceiling Installed for Rooms (105, 106, 107).} ; {Activity date: 04/14/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL ALL TRANS AND SWITCH GEAR OK} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL - Details from these inspections will be entered on 4/14, once I receive email detailing components and locations of these inspections from contractor.} ; {Activity date: 04/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection of installation and conductor terminations for following equipment approved. (MSG-B Gear sections 2-9, MSG-G, Transformer MOVA, Panel MOVA, Chiller 1, Chiller 2, Chiller 3, Chiller pumps and VFD’s for 1-6, AHU-6A, AHU-6B, AHU-4A, AHU-4B, AHU-3, DP-A1, DP-B1, LDP-1, Generator, T- GPPA, Quick connect for generator & Disconnect for roll up chiller).
} ; {Activity date: 04/06/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, no inspection today today see previous notes.} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Feeders and Overcurrent from MSG-A to (MDS-A, MDS-B, MDS-AB) Inspected and ok to energize these service locations. B side and branch circuit terminations complete but to remain locked and tagged till further inspection.} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Operation center transmission control cable tray installed. Branch circuits installed below 2nd floor from Gl 12-17.} ; {Activity date: 03/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Lobby 100 Electrical in south wall ok to sheetrock. Storage room 111 in wall Electrical ok to sheetrock.

}
09/14/2021 COT - LCBU - Framing Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 04/27/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL INSPECTION OF ROOMS 105, 106, 107 OK TO START SHEETROCK}
09/14/2021 COT - LCEL - Electrical Underground Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 04/26/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL SEE PREVIOUS NOTES} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Low voltage conduits interconnected from OC to exterior vault.}
09/14/2021 COT - LCPL - Plumbing Progress Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 07/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, inspection for future Training Building Sanitary sewer and water line installed and tested, ok to BACK FILL.}
09/14/2021 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 05/26/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial. Operation Center; 72 each VAB Units per plan. Ok to energize systems.}
09/14/2021 COT - LCEL - Construction Power Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Inspection for (MSG-A) ok to Energize Gear on A side only, clear TEP ECO.
}
09/14/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Inspection for rooms 105, 106, 107(mens, womens and janitor closet) potable water lines and DWV installed and tested.} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL - Details from these inspections will be entered on 4/14, once I receive email detailing components and locations of these inspections from contractor.} ; {Activity date: 04/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, chilled lines under test on data hall 131, MPOP WEST 150,151, MPOP EAST 103,104, UPS room 147 3A. Ok to insulate lines.} ; {Activity date: 04/06/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, no inspection today today see previous notes.} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Chilled main lines installed and under air test for 1st floor. IDF 221 chilled lines installed below 2nd floor.}
09/14/2021 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.}
09/14/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 05/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Hydrostatic test on chilled lines complete.
} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Hydroponic piping installed and tested at following units ( CRAH-3B, CRAH-1A, CRAH-1B, FCU-1A, FCU-1B, AHU-1A, AHU-1B)

} ; {Activity date: 04/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, 1st and 2nd floor Low/Medium pressure ducts installed and ok to start insulation. OB} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, Chilled main lines installed and under air test for 1st floor & ok to insulate lines. IDF 221 chilled lines installed below 2nd floor. AHU’s installed GL 12-17 below second floor.}
09/14/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.}
09/14/2021 COT - HCBU - Interior Shear Bracing Passed {Activity date: 09/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 05/05/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, first floor Rooms 105,106,107 ok to tape and proceed.

} ; {Activity date: 04/27/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL SEE PREVIOUS NOTES} ; {Activity date: 03/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Operating center sheetrock progress.}
09/24/2021 COT - LCME - Mechanical Final Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved
} ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Site inspection for TCO, Provide air balance report prior to final.} ; {Activity date: 09/14/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - ) Not Ready
}
09/24/2021 COT - LCEL - Outdoor Lighting Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved
} ; {Activity date: 09/14/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - ) Not Ready
}
09/24/2021 COT - FCON - Sprinkler - Final Passed {Activity date: 09/24/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Trim throughout
Leaking riser- level 1 preaction
relocate head in chase closet
Head leaking in locker room next to 2nd floor dist. center} ; {Activity date: 09/14/2021; Status: Cancelled; Inspector: jfordney; Comment: Entered by JFORDNE1 - }
09/24/2021 COT - LCPL - Plumbing Final Passed {Activity date: 09/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved
} ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Site inspection for TCO, correct ADA required height second floor restroom countertops. Install signage for all restrooms. Provide water chlorination report prior to final.
}
12/14/2021 COT - FCON - Alarm - Final Passed {Activity date: 12/14/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 09/17/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Document box
ROC} ; {Activity date: 09/15/2021; Status: Denied; Inspector: jfordney; Comment: Entered by JFORDNE1 - Volume on alarm insufficient
smokes where demo to take place need to be retested
BDA system
Pre-qction switches didn't work}
12/14/2021 COT - FCON - Fire - Final Passed {Activity date: 12/14/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 09/24/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Approved to obtain TCO} ; {Activity date: 09/23/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Alarm final approval needed
lighting at exit discharges
Block access to connector building from south stairwell
Data room exit
access from terrace
NW stairwell egress- no tripping hazard
Signage- FDC riser room, FACP electrical rooms}
04/06/2022 COT - LCBU - Building Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Ok to apply for TCO Operations CENTER only.} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, site inspection for TCO see notes. Submit all special inspection reports for pending special conditions. Once all conditions have been met walk through is required prior to TCO release.}
04/06/2022 COT - LCEL - Electrical Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Site inspection for TCO, update all panel schedules and install exterior lighting at Egress locations. Seal missed penetrations at fire walls.} ; {Activity date: 09/14/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - ) Not Ready
}

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW