Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
MULTI FAMILY NEW
Address:
250 E GRANT RD
Apply Date:
10/14/2019
Applicant:
N/A
Description:
NEW 63 UNIT MULTI-FAMILY DEVELOPMENT
Contractors:
  • CANYON BUILDING AND DESIGN LLC *APA*

Permit Reviews

Permit Number - T19CM07546
Permit Status: C of o
Permit Description: NEW 63 UNIT MULTI-FAMILY DEVELOPMENT
Start Date Submittal Complete Date Status  
01/17/2020 RESUBMITTAL 02/05/2020 COMPLETED Review Details
03/04/2021 REVISION - - 1ST 03/30/2021 COMPLETED Review Details
05/10/2021 REVISION - - 2ND 05/21/2021 COMPLETED Review Details
10/14/2019 PLANS OK TO SUBMIT - COMM 10/17/2019 COMPLETED Review Details
10/17/2019 COMMERCIAL - NEW 11/22/2019 COMPLETED Review Details
11/27/2019 RESUBMITTAL - TI ALL 01/17/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM07546
Permit Status: C of o
Permit Description: NEW 63 UNIT MULTI-FAMILY DEVELOPMENT
Total Outstanding Activity Conditions - 1
Date Name
10/14/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM07546
Permit Description: NEW 63 UNIT MULTI-FAMILY DEVELOPMENT
Total Completed Inspections - 44
Date Description Inspector Results Comments
07/28/2020 ELECTRIC - UFER ESTEVENS Approved Approved
08/07/2020 SITE - SEWER ESTEVENS Approved Partial. Northeast corner to northwest corner passed pressure testing.
08/24/2020 TEP CLEARANCE - PM ESTEVENS Approved CODE TMPP
08/24/2020 ELECTRIC - PROGRESS ESTEVENS Approved Partial. Temporary power panel needed to be moved. Inspected new location and approved. Once power is cut the old panel will be removed.

The TEP clearance code is TMPP.
08/27/2020 ELECTRIC - UNDERGROUND ESTEVENS Approved Change to partial status please. From transformer to south side of building to service panels.
09/09/2020 PLUMBING - PRE SLAB ESTEVENS Approved Partial. With the gridlines of A1 to A2.5 and H1 to H2.5.
09/09/2020 BUILDING PRE-SLAB ESTEVENS Approved Partial. With the gridlines of A1 to A2.5 and H1 to H2.5.
09/16/2020 PLUMBING - YARD WTR LINE/TEST ESTEVENS Approved Partial. Yard waterline, from north east corner to stairwell stub out
09/16/2020 PLUMBING - ROUGH, SOIL ESTEVENS Approved Not ready not complete
10/14/2020 REINFORCED MASONRY PRE-GROUT ESTEVENS Approved Partial. North east corner to the south east corner site wall.
10/15/2020 SHEET ROCK NAILING ESTEVENS Approved Partial. 1st floor ceiling and duct chases on west side of building.
11/17/2020 EXCAVATION/LAYOUT REBAR & ZON ESTEVENS Approved Partial. North east corner retaining wall footing.
11/17/2020 BUILDING ABOVE CEILING ESTEVENS Approved Partial. 2nd floor corridor. Gridlines A1 to A3 and AH to H3
12/15/2020 BUILDING - PROGRESS ESTEVENS Approved PARTIAL, NOT READY, NORTH WEST CORNER OF ENTRANCE AND RETAINING WALL.
12/17/2020 FRAMING ESTEVENS Approved Partial. Level one. Unit 101, 102, 111, 112.

Partial. First floor only, exterior walls that do not contain plumbing, are ok to insulate.
12/17/2020 MECHANICAL - ABOVE CEILING ESTEVENS Approved
12/17/2020 MECHANICAL - INTERMEDIATE ESTEVENS Approved
12/17/2020 PLUMBING - ABOVE CEILING ESTEVENS Approved Partial. Level 2. Units 201, 202, 211, 212. Level three units 301, 302, 311, 312.
12/17/2020 PLUMBING - ABOVE CEILING ESTEVENS Approved Partial. Level one. Unit 101, 102, 111, 112.
12/29/2020 ROOF NAILING ESTEVENS Approved Approved. A1 to H1 and A3 to H3.
12/30/2020 EXT METAL CLIPS/EXT SHEATHING ESTEVENS Approved APPROVED
12/30/2020 PLUMBING - INTERMEDIATE ESTEVENS Approved PARTIAL ON UNIT 303, 304, DWV ONLY
12/30/2020 PLUMBING - INTERMEDIATE ESTEVENS Approved PARTIAL ON UNITS 103, 104, 203, 204
12/30/2020 ELECTRIC - INTERMEDIATE ESTEVENS Approved PARTIAL ON UNITS 103, 104, 203, 204
03/25/2021 ELECTRIC - FINAL DQUINN Approved
03/25/2021 ELECTRIC - SERVICE UPGRADE DQUINN Approved
04/02/2021 TEP CLEARANCE - AM ESTEVENS Approved CODE ECO/UNITS 101-114
05/11/2021 PLUMBING - BACK WATER VALVE ESTEVENS Approved
05/11/2021 PLUMBING - SEWER HCS CONNECT ESTEVENS Approved
05/11/2021 U VALUE FOR WINDOW ESTEVENS Approved
05/11/2021 STUCCO MESH ESTEVENS Approved
06/17/2021 OUTDOOR LIGHTING FINAL JBURGE Approved
06/17/2021 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved
06/17/2021 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved
07/15/2021 ELECTRIC - ABOVE CEILING ESTEVENS Approved 2036 ,2061, 3035, 3075, 4035, 4075, 4090. All seven are approved.
07/15/2021 ELECTRIC - CONSTRUCTION POWER ESTEVENS Approved 2036 ,2061, 3035, 3075, 4035, 4075, 4090. All seven are approved.
07/15/2021 PLUMBING - PROGRESS ESTEVENS Approved 2036 ,2061, 3035, 3075, 4035, 4075, 4090. All seven are approved.
07/15/2021 MECHANICAL - PROGRESS ESTEVENS Approved 2036 ,2061, 3035, 3075, 4035, 4075, 4090. All seven are approved.
07/15/2021 MECHANICAL - FINAL ESTEVENS Approved 2036 ,2061, 3035, 3075, 4035, 4075, 4090. All seven are approved.
07/16/2021 FIRE - FINAL jfordney Approved
07/16/2021 FIRE SPKLR - FINAL jfordney Approved
07/16/2021 FIRE - ALARM FINAL jfordney Approved
07/19/2021 BUILDING - FINAL RSHERRY Approved
07/19/2021 PLUMBING - FINAL RSHERRY Approved REVIEW OF WATER DISINFECTION REPORT COMPLETED

Documents

File Name Document Type  
T19CM07546 - COFO.PDF DOCUMENTS VIEW
AIR SYSTEM SUMMARY.PDF DOCUMENTS VIEW
GEOTECH EVALUATION.PDF DOCUMENTS VIEW
FEE SHEETS.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
INSPECTIONS.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOIST FINAL AD.PDF DOCUMENTS VIEW
JOIST CALCS COVER.PDF DOCUMENTS VIEW
PLAN SET.PDF CONSTRPLANS VIEW
PLAN REVIEW CARD - REVISED.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERT.PDF DOCUMENTS VIEW
REV1_GRANT SITE WALL.PDF DOCUMENTS VIEW
TRUSS CALCS.PDF DOCUMENTS VIEW
TRUSS DRAWING.PDF DOCUMENTS VIEW
CONTRACTOR LETTERHEAD DOCUMENTS VIEW