Permit: T19CM07546

Parcel: 11501155V


Addresses:

250 E GRANT RD


Inspection Status: Approved

Inspection History: BUILDING ABOVE CEILING

Permit Number - T19CM07546

Inspection Description - BUILDING ABOVE CEILING

Inspection Status - Approved

Date Description Inspector Results Comments
06/17/2021 BUILDING ABOVE CEILING Approved
05/12/2021 BUILDING ABOVE CEILING Partial Approval Above ceiling in the Corridor‘s in Levels two and three.
05/11/2021 BUILDING ABOVE CEILING Partial Approval Partial. Level one corridor, laundry room and office.
03/26/2021 BUILDING ABOVE CEILING Partial Approval Partial. Units 217 through 221.
03/19/2021 BUILDING ABOVE CEILING Partial Approval Partial. Units. 317, 318, 319, 320.
03/18/2021 BUILDING ABOVE CEILING Partial Approval Partial. Units 213, 214, 215.
03/11/2021 BUILDING ABOVE CEILING Partial Approval Partial. Level#3; Room Units 301; 302; 311; 312
03/04/2021 BUILDING ABOVE CEILING Partial Approval Partial. Level #2; Room Units #201 - 212. Ok to cover ceilings and soffits. Level #3 Corridor, Ok to spray insulate deck above,
03/01/2021 BUILDING ABOVE CEILING Partial Approval PARTIAL - ok in units 201, 202, 212. de in units 203 and 211. Many missed fire caulk locations in these units.
02/24/2021 BUILDING ABOVE CEILING Partial Approval Partial. Demising walls only, for spray foam insulation. Level three units 315, 316, 317, 318, 319, 320, 321, and level one office bathroom
02/23/2021 BUILDING ABOVE CEILING Cancelled CANCELLED BY CONTRACTOR
11/17/2020 BUILDING ABOVE CEILING Partial Approval Partial. 2nd floor corridor. Gridlines A1 to A3 and AH to H3