Permit: T18CM09411
Permit Details
Apply Date:
11/30/2018
Applicant:
Scott Neeley
Description:
NEW SFR
Permit Reviews
Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/30/2018 | PLANS OK TO SUBMIT - RES | 11/30/2018 | COMPLETED |
11/30/2018 | RESIDENTIAL - BLDG/WWM | 01/10/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/30/2018 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Date | Description | Comments |
---|---|---|
11/30/2018 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
03/01/2021 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T18CM09411
Permit Description: NEW SFR
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/11/2019 | COT - RSPL - Yard Water Line | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } | |
06/11/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 06/11/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } | |
06/19/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - } | |
06/19/2019 | COT - RSBU - Preslab | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - } | |
06/19/2019 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - } | |
06/19/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - } | |
06/26/2019 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } | |
07/09/2019 | COT - RSPL - Sewer | Passed | {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Return inspection } |
|
08/08/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 08/08/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - CODE TMPP} | |
08/08/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 08/08/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok for construction power. CLEARANCE: Code: TMPP} |
|
09/18/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 09/18/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok to dry-in roof system.} | |
09/18/2019 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 09/18/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok to cover exterior walls} | |
12/11/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 12/11/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates. 2- Shall provide (3) sided blocking on the second floor forced air vents. 3- Shall provide a clean out at the 3 inch soil stack. 4- Shall secure the horizontal pex water lines every 32 inches.} |
|
12/13/2019 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 12/13/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/11/2019; Status: Denied; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - See 1035. Mechanical, electrical, plumbing all AP.} ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates. 2- Shall provide (3) sided blocking on the second floor forced air vents. 3- Shall provide a clean out at the 3 inch soil stack. 4- Shall secure the horizontal pex water lines every 32 inches.} |
|
12/13/2019 | COT - LCBU - Framing | Passed | {Activity date: 12/13/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/11/2019; Status: Denied; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - Replace stud at patio wall west side that is in 2 pieces, plans call for full height stud. Kitchen where exhaust duct goes thru top plate need to put fha plates across both plates. Recall prior to placing osb on walls.} ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates. 2- Shall provide (3) sided blocking on the second floor forced air vents. 3- Shall provide a clean out at the 3 inch soil stack. 4- Shall secure the horizontal pex water lines every 32 inches.} |
|
06/04/2020 | COT - RSME - Mechanical Final | Passed | {Activity date: 06/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - } | |
08/21/2020 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 08/21/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Approved} | |
08/21/2020 | COT - RSEL - Electrical Final | Passed | {Activity date: 08/21/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Approved} | |
09/04/2020 | COT - RSPL - Plumbing Final | Passed | {Activity date: 09/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved. } ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Partial approval need anti hammer device on dishwasher line } |
|
09/04/2020 | COT - RSBU - Masonry Pregrout | Passed | {Activity date: 09/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved. } ; {Activity date: 06/26/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Except fence at doors per detail 108 } |
|
03/01/2021 | RSBU - Building Final | Passed | {Activity date: 03/01/2021; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - CERT FILED} ; {Activity date: 02/26/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL APPROVE 1090 AND CLOSE WHEN DOUBLE STAMP IS RECEIVED} ; {Activity date: 09/04/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - APPROVED PENDING SPECIAL INSPECTIONS } ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Partial approval please adjust garage door and hinges} |