Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Address:
485 W 18TH ST
Apply Date:
11/30/2018
Applicant:
Scott Neeley
Description:
NEW SFR

Permit Reviews

Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Start Date Submittal Complete Date Status  
11/30/2018 PLANS OK TO SUBMIT - RES 11/30/2018 COMPLETED Review Details
11/30/2018 RESIDENTIAL - BLDG/WWM 01/10/2019 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Total Outstanding Activity Conditions - 1
Date Name
11/30/2018 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T18CM09411
Permit Status: Expired
Permit Description: NEW SFR
Date Description Comments
11/30/2018 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
03/01/2021 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Completed Inspections

Permit Status: Expired
Permit Number: T18CM09411
Permit Description: NEW SFR
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/11/2019 COT - RSPL - Yard Water Line Passed {Activity date: 06/11/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - }
06/11/2019 COT - RSPL - Rough Soil Passed {Activity date: 06/11/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - }
06/19/2019 COT - RSEL - Grounding/Bonding Passed {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
06/19/2019 COT - RSBU - Preslab Passed {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
06/19/2019 COT - RSEL - Electrical Underground Passed {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
06/19/2019 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 06/19/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - }
06/26/2019 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - }
07/09/2019 COT - RSPL - Sewer Passed {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Return inspection
}
08/08/2019 PDSD Building Division - TEP PM Clearance Passed {Activity date: 08/08/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - CODE TMPP}
08/08/2019 COT - RSEL - Construction Power Passed {Activity date: 08/08/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok for construction power.

CLEARANCE: Code: TMPP}
09/18/2019 COT - RSBU - Roof Nailing Passed {Activity date: 09/18/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok to dry-in roof system.}
09/18/2019 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 09/18/2019; Status: Approved; Inspector: JBURGE; Comment: Entered by DMERANZ1 - Ok to cover exterior walls}
12/11/2019 COT - LCPL - Plumbing Intermediate Passed {Activity date: 12/11/2019; Status: Approved; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates.
2- Shall provide (3) sided blocking on the second floor forced air vents.
3- Shall provide a clean out at the 3 inch soil stack.
4- Shall secure the horizontal pex water lines every 32 inches.}
12/13/2019 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 12/13/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/11/2019; Status: Denied; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - See 1035. Mechanical, electrical, plumbing all AP.} ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates.
2- Shall provide (3) sided blocking on the second floor forced air vents.
3- Shall provide a clean out at the 3 inch soil stack.
4- Shall secure the horizontal pex water lines every 32 inches.}
12/13/2019 COT - LCBU - Framing Passed {Activity date: 12/13/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } ; {Activity date: 12/11/2019; Status: Denied; Inspector: JCLAXTON; Comment: Entered by DMERANZ1 - Replace stud at patio wall west side that is in 2 pieces, plans call for full height stud.

Kitchen where exhaust duct goes thru top plate need to put fha plates across both plates.

Recall prior to placing osb on walls.} ; {Activity date: 12/06/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates.
2- Shall provide (3) sided blocking on the second floor forced air vents.
3- Shall provide a clean out at the 3 inch soil stack.
4- Shall secure the horizontal pex water lines every 32 inches.}
06/04/2020 COT - RSME - Mechanical Final Passed {Activity date: 06/04/2020; Status: Approved; Inspector: TVALENCIA; Comment: Entered by RSALDAT1 - }
08/21/2020 COT - RSEL - Outdoor Lighting Passed {Activity date: 08/21/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Approved}
08/21/2020 COT - RSEL - Electrical Final Passed {Activity date: 08/21/2020; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Approved}
09/04/2020 COT - RSPL - Plumbing Final Passed {Activity date: 09/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved.
} ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Partial approval need anti hammer device on dishwasher line

}
09/04/2020 COT - RSBU - Masonry Pregrout Passed {Activity date: 09/04/2020; Status: Approved; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Approved.
} ; {Activity date: 06/26/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - Except fence at doors per detail 108
}
03/01/2021 RSBU - Building Final Passed {Activity date: 03/01/2021; Status: Approved; Inspector: KEN; Comment: Entered by KKARSEN1 - CERT FILED} ; {Activity date: 02/26/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL APPROVE 1090 AND CLOSE WHEN DOUBLE STAMP IS RECEIVED} ; {Activity date: 09/04/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - APPROVED PENDING SPECIAL INSPECTIONS
} ; {Activity date: 08/21/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by JSCHNEI2 - Partial approval please adjust garage door and hinges}

Documents

File Name Document Type  
BLOWER DOOR TESTS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
GEO INSPECTION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
POST TENSION CABLE INSPECTION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
BLOWER DOOR TESTS.PDF DOCUMENTS VIEW
GEO INSPECTION.PDF DOCUMENTS VIEW
POST TENSION CABLE INSPECTION.PDF DOCUMENTS VIEW
001_A-1.TIF CONSTRPLANS VIEW
002_A-2.TIF CONSTRPLANS VIEW
003_A-3.1.TIF CONSTRPLANS VIEW
004_A-3.2.TIF CONSTRPLANS VIEW
005_A-4.TIF CONSTRPLANS VIEW
006_A-5.TIF CONSTRPLANS VIEW
007_A-6.TIF CONSTRPLANS VIEW
008_A-7.TIF CONSTRPLANS VIEW
009_M-1.TIF CONSTRPLANS VIEW
010_E-1.TIF CONSTRPLANS VIEW
011_E-2.TIF CONSTRPLANS VIEW
012_P-1.TIF CONSTRPLANS VIEW
013_S-0.1.TIF CONSTRPLANS VIEW
014_S-0.2.TIF CONSTRPLANS VIEW
015_S-1.0.TIF CONSTRPLANS VIEW
016_S-2.0.TIF CONSTRPLANS VIEW
017_S-3.0.TIF CONSTRPLANS VIEW
018_S-4.0.TIF CONSTRPLANS VIEW
019_S-5.0.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW