Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 12/11/2019 |
COT - LCPL - Plumbing Intermediate |
JCLAXTON |
Approved |
Entered by DMERANZ1 - |
| 12/06/2019 |
COT - LCPL - Plumbing Intermediate |
TVALENCIA |
Denied |
Entered by DMERANZ1 - 1- Shall seal all electric conductors that penetrate the top plates.
2- Shall provide (3) sided blocking on the second floor forced air vents.
3- Shall provide a clean out at the 3 inch soil stack.
4- Shall secure the horizontal pex water lines every 32 inches. |