Permit: T17CM08232
Permit Details
Apply Date:
11/03/2017
Applicant:
Description:
TI: VET HOSPITAL: OK TO OCCUPY
Permit Reviews
Permit Number - T17CM08232
Permit Status: Complete
Permit Description: TI: VET HOSPITAL: OK TO OCCUPY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2018 | POST 3RD PARTY REVIEW | 07/05/2018 | COMPLETED |
| 11/03/2017 | PLANS OK TO SUBMIT - COMM | 11/03/2017 | COMPLETED |
| 11/06/2017 | 3RD PARTY REVIEW - COMMERCIAL | 05/07/2018 | COMPLETED |
Conditions
Permit Number - T17CM08232
Permit Status: Complete
Permit Description: TI: VET HOSPITAL: OK TO OCCUPY
| Date | Description | Comments |
|---|---|---|
| 11/03/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T17CM08232
Permite Description: TI: VET HOSPITAL: OK TO OCCUPY
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2019 | COT - HCBU - Exterior Clips/Sheathing | N/A | Canceled | {Activity date: 01/30/2019; Status: Not Applicable; Inspector: RCHANDLER; Comment: Entered by CBELL1 - } |
| 11/07/2022 | COT - LCPL - Gas Pressure Test | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCBU - Building Final | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCEL - Electrical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCBU - Framing | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCME - Mechanical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | TRSP - ROW - Final/Close-Out | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCME - Mechanical Intermediate | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCBU - Building Progress | N/A | Canceled | Inspection Canceled |
| 11/07/2022 | COT - LCPL - Medical Gas/Test | N/A | Canceled | Inspection Canceled |
| 12/27/2023 | COT - HCPL - Medical Gas/Test | N/A | Not Applicable | Not performed by building inspector, approved by the vendor who supplied medical gases. |
Completed Inspections
Permit Status: Complete
Permit Number: T17CM08232
Permit Description: TI: VET HOSPITAL: OK TO OCCUPY
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2018 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 08/28/2018; Status: Approved; Inspector: GWest; Comment: Entered by GWEST2 - 3/0 copper GEC connected to rebar in footing with DB/concrete encasement clamps} | |
| 09/17/2018 | COT - LCPL - Rough Soil | Passed | {Activity date: 09/14/2018; Status: Denied; Inspector: BJONES; Comment: Entered by BJONES1 - NO WATER IN TEST PIPE} ; {Activity date: 09/17/2018; Status: Approved; Inspector: DQUINN; Comment: Entered by DQUINN1 - } ; {Activity date: 09/10/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by CMURPHY1 - most of South Side okay appear to be missing couple of connections by food prep area okay to cover all but that area.} ; {Activity date: 09/07/2018; Status: Partial Approval; Inspector: MHASSAN; Comment: Entered by CMURPHY1 - F3 North or North half of building okay.} | |
| 03/18/2019 | COT - LCPL - Sewer | Passed | {Activity date: 03/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - ok to backfill} | |
| 03/18/2019 | COT - LCPL - Backwater Valve | Passed | {Activity date: 03/18/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } | |
| 03/25/2019 | COT - LCPL - Yard Water Line | Passed | {Activity date: 03/25/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by CBELL1 - } | |
| 04/08/2019 | COT - LCPL - Medical Gas Preconstruction Mtg | Passed | {Activity date: 04/08/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by CBELL1 - } | |
| 05/15/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by CBELL1 - CODE ECO} | |
| 05/15/2019 | COT - LCEL - Construction Power | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by CBELL1 - Ufers connected, Gas is bonded, Water is bonded. All sized in accordance with the NEC based on SE Cable size. Main bonding jumper is attached to the can. TEP was called for Clearance on this new and separate Switch Gear. Spoke with Natalie, ECO.} ; {Activity date: 05/09/2019; Status: Correction Required; Inspector: GWEST; Comment: Entered by VFLORES1 - Install water bond and gas bond for TEP Clearance} |
|
| 05/15/2019 | COT - LCEL - Service Upgrade | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: GWEST; Comment: Entered by CBELL1 - Ufers connected, Gas is bonded, Water is bonded. All sized in accordance with the NEC based on SE Cable size. Main bonding jumper is attached to the can.} ; {Activity date: 05/09/2019; Status: Correction Required; Inspector: GWEST; Comment: Entered by VFLORES1 - Install water bond and gas bond for TEP Clearance} | |
| 10/01/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
| 10/01/2019 | PDSD Building Division - Sign Final | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
| 12/04/2019 | COT - LCEL - Electrical Underground | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by SFLORES2 - } ; {Activity date: 10/03/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by DMERANZ1 - Phase one.} ; {Activity date: 03/14/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - 4- 4" Conduits to switch gear at building} ; {Activity date: 02/13/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - 50’ 4” pvc conduit includes 2 runs to TEP and 4 runs to distribution panels} ; {Activity date: 09/19/2018; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - from grid H5 to south END of building} ; {Activity date: 09/20/2018; Status: Partial Approval; Inspector: GWEST; Comment: Entered by CBELL1 - Under conduit remainder of bldg} ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by CBELL1 - Under slab} | |
| 12/04/2019 | COT - LCEL - Outdoor Lighting | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by SFLORES2 - } | |
| 12/04/2019 | COT - LCBU - Preslab | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by SFLORES2 - } ; {Activity date: 10/08/2018; Status: Partial Approval; Inspector: GWest; Comment: Entered by GWEST2 - Approved South half pour} ; {Activity date: 10/01/2018; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by DQUINN1 - NORTH 1/2 OF BUILDING OK TO POUR} | |
| 12/04/2019 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 12/04/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by SFLORES2 - } ; {Activity date: 07/26/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VFLORES1 - } | |
| 11/17/2020 | COT - BULD - SWG Clearance | Passed | {Activity date: 11/17/2020; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - CODE} ; {Activity date: 10/01/2019; Status: Approved; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - } | |
| 01/13/2021 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 01/13/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Phase 3, 2nd floor, rooms 203, 204, 205A, 209, bathrooms, lactation room. } ; {Activity date: 11/17/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Partial. Phase two all hard-lid areas ok. } ; {Activity date: 11/16/2020; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by PAHUMAD1 - Not ready, Contractor cancelled.} ; {Activity date: 09/21/2020; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by JSCHNEI2 - pa All 1st floor phase 2 potable and abs ok to cover. } ; {Activity date: 07/16/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by JSCHNEI2 - Partial. All underground waste lines... ok to infill slab, phase two.} ; {Activity date: 02/27/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by BSTEVENS - } ; {Activity date: 02/01/2019; Status: Partial Approval; Inspector: BJONES; Comment: Entered by CBELL1 - North and East Exterior Walls Only Rain leaders & 2 Patient rooms} ; {Activity date: 01/30/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by CBELL1 - All except DWV areas.} |
|
| 01/20/2021 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 01/20/2021; Status: Approved; Inspector: TTREMBULAK; Comment: Entered by RSALDAT1 - -AP} ; {Activity date: 11/17/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Partial. Phase two all hard-lid areas ok. } ; {Activity date: 12/04/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by ESTEVEN1 - PHASE ONE COMPLETE} ; {Activity date: 07/26/2019; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VFLORES1 - } ; {Activity date: 07/16/2019; Status: Not ready for Inspection; Inspector: GWEST; Comment: Entered by DMERANZ1 - Mark, Superintendent will call this in next week. } |
|
| 10/08/2021 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 10/08/2021; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Partial. Phase 3, lobby, second-floor hard lids and office area one side.} ; {Activity date: 01/26/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL PHASE 3 SECOND FLOOR, INCLUDING HARD LID AREAS} ; {Activity date: 01/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTIAL, PHASE II COMPLETE, OK TO TAPE PROGRESS AREA} ; {Activity date: 12/03/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by PAHUMAD1 - Partial. Phase two... south half.} ; {Activity date: 03/11/2020; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by BSTEVENS - } | |
| 02/09/2022 | COT - LCEL - Electrical Final | Passed | {Activity date: 02/09/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - PARTIAL APPROVAL FOR SECOND PHASE ONLY} ; {Activity date: 12/30/2019; Status: Partial Approval; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - OK phase 1.} ; {Activity date: 12/10/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Inspection for phase 1 only, provide GFI protection where needed, restroom exhaust fans to run continuously during business hours.} | |
| 02/15/2022 | COT - LCPL - Plumbing Final | Passed | {Activity date: 02/15/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by VVERA1 - AP recommend issuing TCO upon correction of air balance report issue and approval of other inspections. Duo 520-981-7697 Ready now } ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - PARTIAL APPROVAL FOR SECOND PHASE ONLY} ; {Activity date: 04/21/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT FOR PHASE 2 COMPLETED} ; {Activity date: 02/21/2020; Status: Partial Approval; Inspector: WGALLAG1; Comment: Entered by DMERANZ1 - SPECIAL INSPECTION FOR MEDICAL GASES IS REQUIRED} ; {Activity date: 12/12/2019; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF THE WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 12/10/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Inspection for phase 1 only,Provide sterilization report, provide med gas Nitrogen report, complete all inspections.} |
|
| 02/24/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/24/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} ; {Activity date: 02/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/CONTRACTOR IS RESCHEDULING INSPECTION. } ; {Activity date: 12/04/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by SFLORES2 - } |
|
| 02/25/2022 | COT - FCON - Alarm - Final | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 02/24/2022; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - -Phase 3-We tested the horns and strobes and all worked -The duct detector on 2nd floor needs to be re-tested. It did not report to panel and did not shut down HVAC unit.} ; {Activity date: 04/28/2021; Status: Partial Approval; Inspector: CBASALDUA; Comment: Entered by CBASALD1 - 1. Ok for TCO for Phase 2. 2. Phase 3 is next.} ; {Activity date: 02/03/2020; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - OK for TCO in new addition to animal hospital. -Add notification in 2nd floor locker room of addition Alarm system will extend into existing side as tenant improvement is being done.} |
|
| 02/25/2022 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 02/24/2022; Status: Cancelled; Inspector: MRoss; Comment: Entered by MROSS2 - Cancelled by contractor} ; {Activity date: 02/03/2020; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - -Submit as-built plans to TFD} ; {Activity date: 03/05/2019; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - Sprinkler OH & Hydro - Partial inspection 1 of 3. First floor only. - Provide As-Built plans for changes to piping -Verify allowable volume of concealed combustible areas -Combustible stairs need to be covered with non combustible materials or have sprinkler coverage.} |
|
| 02/25/2022 | COT - FCON - Fire - Final | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: wmotto1; Comment: Entered by WMOTTO1 - } ; {Activity date: 02/03/2020; Status: Partial Approval; Inspector: MRoss; Comment: Entered by MROSS2 - OK for TCO of new addition to animal hospital } |
|
| 08/04/2022 | COT - LCME - Mechanical Final | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} ; {Activity date: 04/11/2022; Status: Correction Required; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - THE MINIMUM EXHAUST FLOW RATE FOR ANIMAL HOLDING ROOMS (EF-2) IS 0.9 CFM PER SF} ; {Activity date: 02/10/2022; Status: Correction Required; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - EXHAUST FLOW RATES FOR EF-1 & EF-2 MORE THAN 10% BELOW REQUIREMENT} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Partial. Pending air balance report for last phase.} ; {Activity date: 04/28/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, phase 2 mechanical complete.} ; {Activity date: 04/22/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - PARTIAL APPROVAL FOR SECOND PHASE ONLY, 2 FURNACES REQIRE REROUTED EXHAUST PIPES IN SECOND STORY DOGHOUSE AREA} ; {Activity date: 12/23/2019; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by SFLORES2 - Phase one} ; {Activity date: 12/11/2019; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} ; {Activity date: 11/21/2019; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by DMERANZ1 - Provide approved air balance report. Serviceable equipment on roof within 10 foot of roof edge must have guard rails. Line set insulation on roof must be coded for UV protection. Remove gooseneck From water heater exhaust, install per manufacture.} | |
| 12/27/2023 | COT - HCBU - Building Final | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCBU - Building Progress | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCBU - Framing | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCEL - Electrical Above Ceiling | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCEL - Electrical Intermediate | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCME - Mechanical Above Ceiling | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | COT - HCPL - Gas Pressure Test | Passed | 12/27/23: Project is complete, tenants are working out of building with a temporary certificate of occupancy. Okay to issue permanent certificate of occupancy for project. | |
| 12/27/2023 | ENGR Engineering Final | Passed |