Permit: T17CM08215
Permit Details
Apply Date:
11/02/2017
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
SERVICE BUILDING
Architects:
- ACORN, KIM BRIAN
Contractors:
- CONCORD GENERAL CONTRACTING INC
Permit Reviews
Permit Number - T17CM08215
Permit Status: C of o
Permit Description: SERVICE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/02/2018 | RESUBMITTAL | 03/20/2018 | COMPLETED |
| 03/20/2018 | RESUBMITTAL | 04/18/2018 | COMPLETED |
| 03/25/2020 | REVISION - - 3RD | 03/26/2020 | ACTIVE |
| 03/28/2018 | RESUBMITTAL | 04/17/2018 | COMPLETED |
| 05/08/2019 | REVISION - - 1ST | 05/08/2019 | COMPLETED |
| 10/24/2019 | REVISION - - 2ND | 10/25/2019 | COMPLETED |
| 11/02/2017 | PLANS OK TO SUBMIT - COMM | 12/15/2017 | COMPLETED |
| 12/14/2017 | COMMERCIAL - NEW | 02/02/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM08215
Permit Status: C of o
Permit Description: SERVICE BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/02/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T17CM08215
Permit Description: SERVICE BUILDING
Total Completed Inspections - 44
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2018 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPPORT REQUIRED |
| 06/12/2018 | STEM WALL/RETAINING WALL | TVALENC1 | Approved | IVRS - Inspection :* 1- STEM WALL BOND BEAM IN SERVICE BAYS PROVIDED, OKAY FOR GROUT. |
| 07/02/2018 | REINFORCED MASONRY PRE-GROUT | DFLORES2 | Approved | WAITING ON SPECIAL INSPECTION PACKAGE PAPER WORK |
| 08/15/2018 | PLUMBING - SEWER HCS CONNECT | DFLORES2 | Approved | SEWER LINE ON EAST SIDE OK TO BACK FILL |
| 08/23/2018 | PLUMBING - GAS PRESSURE TEST | ARUIZ | Approved | IVRS - Inspection :* |
| 01/07/2019 | TEP CLEARANCE - AM | RCHANDLER | Approved | TMPP |
| 01/18/2019 | MECHANICAL - ABOVE CEILING | RCHANDLER | Approved | approved upon 4090 approval from RCHANDLER |
| 01/18/2019 | MECHANICAL - INTERMEDIATE | RCHANDLER | Approved | approved upon 4090 approval from RCHANDLER |
| 01/18/2019 | FIRE SPKLR - OH PIPING & HYDRO | gsereno1 | Approved | AP by JPDavis 8/20/18 |
| 01/18/2019 | FIRE SPKLR - UG PIPING FLUSH | gsereno1 | Approved | AP by JPDavis 8/20/18 |
| 01/18/2019 | FIRE SPKLR - UG, PIPING, HYDRO | gsereno1 | Approved | AP by JPDavis 8/20/18 |
| 04/02/2019 | BUILDING PRE-SLAB | RCHANDLER | Approved | |
| 06/12/2019 | PLUMBING - PROGRESS | RCHANDLER | Approved | |
| 06/14/2019 | EXT METAL CLIPS/EXT SHEATHING | MRAMBER | Approved | Exterior soffits and parapet OK |
| 06/20/2019 | FRAMING | GWEST | Approved | 1st and second floors, from grid line F to C |
| 06/20/2019 | BUILDING - PROGRESS | GWEST | Approved | |
| 09/12/2019 | ELECTRIC - ABOVE CEILING | RCHANDLER | Approved | |
| 09/12/2019 | PLUMBING - ABOVE CEILING | RCHANDLER | Approved | |
| 10/14/2019 | PLUMBING - ROUGH, SOIL | RCHANDLER | Approved | |
| 10/14/2019 | ELECTRIC - PROGRESS | RCHANDLER | Approved | |
| 10/14/2019 | BUILDING ABOVE CEILING | RCHANDLER | Approved | |
| 10/17/2019 | PLUMBING - ROOF DRAINS | RCHANDLER | Approved | |
| 10/25/2019 | EXCAVATION/LAYOUT REBAR & ZON | RCHANDLER | Approved | |
| 11/07/2019 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | 1) Front door needs to have sign that reads " This door to remain unlocked when building is occupied" 1" letters and the locking device is readily distinguishable as locked 1008.1.9.3 2) Second floor "assembly" meeting space occ load is over 60 requires locks to be removed and panic hardware to be installed 1008.1.10 3)Add occupant load signs to the assembly areas 4) Two-way communication shall be provided at the elevator landing 1007.8 5)Need to obtain a KNOX box for the elevator 6) Owner to obtain a places of assembly permit from TFD 7) Lock and Tag out the tire rack until decisions are made |
| 11/07/2019 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | Partial by CB on the 4th of November. Needs heads added to the tire storage rack |
| 11/07/2019 | PLUMBING - INTERMEDIATE | RCHANDLER | Approved | |
| 11/07/2019 | PLUMBING - YARD WTR LINE/TEST | RCHANDLER | Approved | |
| 11/07/2019 | PLUMBING - FINAL | RCHANDLER | Approved | |
| 11/07/2019 | OUTDOOR LIGHTING FINAL | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - UFER | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - INTERMEDIATE | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - TEMPORARY SERVICE | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - CONSTRUCTION POWER | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - OUTDOOR LIGHTING | RCHANDLER | Approved | |
| 11/07/2019 | ELECTRIC - FINAL | RCHANDLER | Approved | |
| 11/07/2019 | BUILDING - FINAL | RCHANDLER | Approved | Approved by inspector, Pending other inspections and outdoorlighting special inspection report. |
| 11/07/2019 | ENGINEERING - FINAL | RLEDONNE | Approved | Walk site with GC and Dave Roberts went over corrections for TCO. And finals. |
| 12/18/2019 | ELECTRIC - UNDERGROUND | RCHANDLER | Approved | Runs to light poles, except two remaining at South Drive access. |
| 12/18/2019 | STUCCO MESH | RCHANDLER | Approved | |
| 12/20/2019 | FIRE - FINAL | JPEELDAVIS | Approved | Two-Way elevator communication not required as building does not need to be ADA compliant. |
| 01/02/2020 | U VALUE FOR WINDOW | RCHANDLER | Approved | |
| 01/13/2020 | SHEET ROCK NAILING | RCHANDLER | Approved | Actually viewed last two light poles. |
| 02/19/2020 | ROOF NAILING | ESTEVENS | Approved | |
| 10/16/2022 | CERTIFICATE OF OCCUPANCY | ESTEVENS | Approved |