Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2020 | FIRE - ALARM FINAL | Approved | ||
| 11/07/2019 | FIRE - ALARM FINAL | Partial Approval | 1) Front door needs to have sign that reads " This door to remain unlocked when building is occupied" 1" letters and the locking device is readily distinguishable as locked 1008.1.9.3 2) Second floor "assembly" meeting space occ load is over 60 requires locks to be removed and panic hardware to be installed 1008.1.10 3)Add occupant load signs to the assembly areas 4) Two-way communication shall be provided at the elevator landing 1007.8 5)Need to obtain a KNOX box for the elevator 6) Owner to obtain a places of assembly permit from TFD 7) Lock and Tag out the tire rack until decisions are made |
|
| 01/18/2019 | FIRE - ALARM FINAL | Partial Approval | Okay for TCO on the first phase North side of building. Fans need to still be tested. |