Permit: T17CM02633
Permit Details
Apply Date:
04/05/2017
Applicant:
JOHN MCGANN
Description:
CENTRAL UTILITY PERMIT
Contractors:
- BRASFIELD AND GORRIE L L C ,
Permit Reviews
Permit Number - T17CM02633
Permit Status: Expired
Permit Description: CENTRAL UTILITY PERMIT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/05/2017 | PLANS OK TO SUBMIT - COMM | 04/05/2017 | COMPLETED |
04/05/2017 | COMMERCIAL - NEW | 05/15/2017 | COMPLETED |
05/15/2017 | RESUBMITTAL | 06/02/2017 | COMPLETED |
06/02/2017 | RESUBMITTAL | 08/08/2017 | COMPLETED |
12/05/2018 | REVISION - - 1ST | 12/05/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM02633
Permit Status: Expired
Permit Description: CENTRAL UTILITY PERMIT
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
04/05/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/14/2017 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
04/14/2017 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
04/14/2017 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
04/14/2017 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
04/14/2017 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/14/2017 | SPECIAL INSPECTION IS REQUIRED FOR CAST IN PLACE ANCHOR BOLTS. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T17CM02633
Permite Description: CENTRAL UTILITY PERMIT
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2019 | BUILDING - FINAL | N/A | Partial Approval | PLEASE SUBMIT YOUR SPECIAL INSPECTION REPORTS TO KEN VANKARSEN PRIOR TO FINAL, THANK YOU 1- recommended for C of O |
Completed Inspections
Permit Status: Expired
Permit Number: T17CM02633
Permit Description: CENTRAL UTILITY PERMIT
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/05/2017 | EXCAVATION/LAYOUT REBAR & ZON | RCAMACHO | Approved | NORTH ELECTRICAL VAULT WALLS ONLY |
04/27/2018 | ELECTRIC - INTERMEDIATE | RBALDWIN | Approved | SOUTHSIDE CAD WELDS COMPLETE , GROUND RING COMPLETE |
06/27/2018 | ELECTRIC - TEMP POWER FOR TEST | RCAMACHO | Approved | NO CLEARANCE REQUIRED AT THIS TIME LOCK OUT TAG OUT ALL SWITCH GEAR LETTER OF TORQUE TEMP POWER FROM RAYTHEON FOR TEST . PERMANENT POWER FROM NEW SUB STATION AT LATER DATE |
06/27/2018 | ELECTRIC - FINAL | RCAMACHO | Approved | NO CLEARANCE REQUIRED AT THIS TIME LOCK OUT TAG OUT ALL SWITCH GEAR LETTER OF TORQUE TEMP POWER FROM RAYTHEON FOR TEST . PERMANENT POWER FROM NEW SUB STATION AT LATER DATE |
08/15/2018 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | Only confirmed the water flow an dtamper signals to the central station. Water flow was set at 42 seconds per Jim Tucker |
08/15/2018 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
08/16/2018 | FIRE - FINAL | JPEELDAVIS | Approved | Fire sprinkler approved. Fire alarm was for flow and tamper only. Ok for TCO. Pay re-inspection fees prior to calling back in |
10/18/2018 | ELECTRIC - PROGRESS | RCAMACHO | Approved | 8 x 5 in & 1 x 4 in to secondaries switch gear A Duct Bank 8 x 5 in & 1 x 4 in switchgear B for future |
03/28/2019 | MECHANICAL - UNDERGROUND | RCAMACHO | Approved | (see permit T17CM02634) |
03/28/2019 | ELECTRIC - UNDERGROUND | RCAMACHO | Approved | (see permit T17CM02634) |
03/28/2019 | ELECTRIC - UFER | RCAMACHO | Approved | (see permit T17CM02634) |
03/28/2019 | MECHANICAL - ABOVE CEILING | RCAMACHO | Approved | |
03/28/2019 | PLUMBING - PRE SLAB | RCAMACHO | Approved | |
03/28/2019 | PLUMBING - INTERMEDIATE | RCAMACHO | Approved | |
03/28/2019 | PLUMBING - ROUGH, SOIL | RCAMACHO | Approved | |
03/28/2019 | BUILDING PRE-SLAB | RCAMACHO | Approved | |
04/03/2019 | PLUMBING - ABOVE CEILING | RCAMACHO | Approved | |
04/03/2019 | PLUMBING - PROGRESS | RCAMACHO | Approved | |
04/03/2019 | PLUMBING - FINAL | RCAMACHO | Approved | |
04/03/2019 | MECHANICAL - PROGRESS | RCAMACHO | Approved | |
04/03/2019 | MECHANICAL - INTERMEDIATE | RCAMACHO | Approved | |
04/03/2019 | ELECTRIC - CONSTRUCTION POWER | RCAMACHO | Approved | |
06/18/2019 | MECHANICAL - FINAL | BSTEVENS | Approved |