Permit: T17CM02633

Parcel: 14043013B

Inspection Status: Approved

Inspection History: ELECTRIC - PROGRESS

Permit Number - T17CM02633

Inspection Description - ELECTRIC - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
10/18/2018 ELECTRIC - PROGRESS Approved 8 x 5 in & 1 x 4 in to secondaries switch gear A Duct Bank
8 x 5 in & 1 x 4 in switchgear B for future
07/17/2018 ELECTRIC - PROGRESS Partial Approval SWITCH GEAR H-ESBA FOR GENERATOR USE OK TO ENERGIZE
COOLING TOWERS ELECTRICAL
06/27/2018 ELECTRIC - PROGRESS Partial Approval NO CLEARANCE REQUIRED AT THIS TIME
LOCK OUT TAG OUT ALL SWITCH GEAR
LETTER OF TORQUE
TEMP POWER FROM RAYTHEON FOR TEST . PERMANENT POWER FROM NEW SUB STATION AT LATER DATE
06/13/2018 ELECTRIC - PROGRESS Partial Approval 4000 AMP SWITCH GEAR PRE CON WITH STURGEON ONLY
05/03/2018 ELECTRIC - PROGRESS Cancelled
05/03/2018 ELECTRIC - PROGRESS Cancelled
05/01/2018 ELECTRIC - PROGRESS Cancelled
04/26/2018 ELECTRIC - PROGRESS Cancelled
04/13/2018 ELECTRIC - PROGRESS Not ready for Inspection