Permit: T17CM02369
Permit Details
Apply Date:
03/27/2017
Applicant:
STICKLEY DESIGN GROUP
Description:
THEATER
Architects:
- SARTAIN, RODNEY
Contractors:
- AR MAYS CONSTRUCTION
Permit Reviews
Permit Number - T17CM02369
Permit Status: C of o
Permit Description: THEATER
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/31/2018 | REVISION - - 1ST | 02/27/2018 | COMPLETED |
02/27/2018 | REVISION - - 1ST | 03/01/2018 | COMPLETED |
03/21/2019 | REVISION - - 3RD | 03/25/2019 | COMPLETED |
03/27/2017 | PLANS OK TO SUBMIT - COMM | 04/03/2017 | COMPLETED |
04/03/2017 | COMMERCIAL - TI | 05/03/2017 | COMPLETED |
08/04/2017 | RESUBMITTAL - TI ALL | 09/14/2017 | COMPLETED |
09/14/2017 | RESUBMITTAL | 10/18/2017 | COMPLETED |
11/01/2017 | RESUBMITTAL | 11/02/2017 | COMPLETED |
11/02/2017 | RESUBMITTAL | 11/13/2017 | COMPLETED |
11/29/2018 | REVISION - - 2ND | 11/29/2018 | COMPLETED |
12/11/2018 | REVISION - - 2ND | 12/20/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T17CM02369
Permit Status: C of o
Permit Description: THEATER
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/27/2017 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T17CM02369
Permit Description: THEATER
Total Completed Inspections - 33
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2017 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
11/01/2017 | PLUMBING - FINAL | RSHERRY | Approved | WATER CHLORINATION REPORT REQUIRED |
11/22/2017 | ELECTRIC - UNDERGROUND | RGREENE | Approved | GRIDLINES 1-6 (E THRU H) |
06/26/2018 | PLUMBING - GAS PRESSURE TEST | DFLORES2 | Approved | |
06/26/2018 | BUILDING PRE-SLAB | DFLORES2 | Approved | THEATER 6 IS GOOD TO POUR |
07/19/2018 | MECHANICAL - INTERMEDIATE | BJONES1 | Approved | IVRS - Inspection :* |
10/17/2018 | FIRE - FINAL | JPEELDAVIS | Approved | OK FOR TCO 1) Need emergency & exit lights every 100'. Emergency lights to be 11 lux or 1 candella. All egress paths to be illuminated properly. 2) Move the fire sprinkler bell from the south wall to the west wall 3) Shut down the music system in the hallway, lobby and bathrooms 4) Needs address front 15" letter and on all back doors 5) Needs the following signs: Fire Riser Room, F.D.C., Not a Door, Employees only 6) Employee passageway west needs emergency and exit lights 7) Need drawings and permit for the CO2 system 8) Weld/remove back door 9) All exterior doors need to have emergency lights 10) Mezanine needs emergency and exit lights 11) Mezzanine move the light and or adjust the fire sprinkler head over middle projector 12) Obtain a places of assembly permit from TFD |
10/18/2018 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | Need to replace low notification devices Needs RED Lock on the Breaker Need to perform the A&I test for the fire alarm Replace the glass front with a dead front |
10/18/2018 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | |
10/19/2018 | ELECTRIC - FINAL | BJONES | Approved | |
10/19/2018 | ENGINEERING - FINAL | RLEDONNE | Approved | |
10/19/2018 | ENGINEERING - FINAL | RLEDONNE | Approved | COMPLET ALL WORK ON AP PLANS. |
10/22/2018 | HEALTH DEPT - FINAL 724-7908 | C.H | Approved | 30 DAYS - PER C.H 10/19/2018 |
10/22/2018 | OUTDOOR LIGHTING FINAL | bjones1 | Approved | |
10/22/2018 | ELECTRIC - OUTDOOR LIGHTING | bjones1 | Approved | |
10/22/2018 | ELECTRIC - PROGRESS | bjones1 | Approved | |
10/22/2018 | ELECTRIC - ABOVE CEILING | bjones1 | Approved | |
10/22/2018 | ELECTRIC - INTERMEDIATE | bjones1 | Approved | |
10/22/2018 | BUILDING - FINAL | bjones1 | Approved | |
10/22/2018 | BUILDING - PROGRESS | bjones1 | Approved | |
10/22/2018 | SHEET ROCK NAILING | bjones1 | Approved | |
10/22/2018 | FIREWALL/FIREBARRIER/FIRESTOP | bjones1 | Approved | |
10/22/2018 | BUILDING ABOVE CEILING | bjones1 | Approved | |
10/22/2018 | FRAMING | bjones1 | Approved | |
10/22/2018 | EXCAVATION/LAYOUT REBAR & ZON | bjones1 | Approved | |
10/22/2018 | MECHANICAL - ABOVE CEILING | bjones1 | Approved | |
10/22/2018 | PLUMBING - PROGRESS | bjones1 | Approved | |
10/22/2018 | PLUMBING - ABOVE CEILING | bjones1 | Approved | |
10/22/2018 | PLUMBING - INTERMEDIATE | bjones1 | Approved | |
10/22/2018 | PLUMBING - ROUGH, SOIL | bjones1 | Approved | |
03/19/2019 | ELECTRIC - TEMPORARY SERVICE | AQUIROS | Approved | |
03/19/2019 | ELECTRIC - CONSTRUCTION POWER | AQUIROS | Approved | |
05/21/2019 | CERTIFICATE OF OCCUPANCY | MRAMBER | Approved |