Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T16CM03212
Permit Details
Apply Date:
05/03/2016
Applicant:
FARNSWORTH CONSTRUCTION COMPANY
Description:
TI: INTERIOR REMODEL
Architects:
- NIELSEN, TIM RICHARD
Contractors:
- FARNSWORTH CONSTRUCTION COMPANY
Permit Reviews
Permit Number - T16CM03212
Permit Status: C of o
Permit Description: TI: INTERIOR REMODEL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/03/2016 | 3RD PARTY REVIEW - COMMERCIAL TI | 06/02/2016 | COMPLETED |
05/03/2016 | 3RD PARTY REVIEW - COMMERCIAL | 06/10/2016 | COMPLETED |
06/10/2016 | OTHER | 06/13/2016 | ACTIVE |
06/10/2016 | 3RD PARTY REVIEW - COMMERCIAL TI | 06/10/2016 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T16CM03212
Permit Status: C of o
Permit Description: TI: INTERIOR REMODEL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/03/2016 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T16CM03212
Permit Description: TI: INTERIOR REMODEL
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/16/2016 | PLUMBING - ROUGH, SOIL | MRAMBER | Approved | IVRS - Inspection :* |
07/06/2016 | ELECTRIC - TEMPORARY SERVICE | MRAMBER | Approved | IVRS - Inspection :* |
08/02/2016 | PLUMBING - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
09/09/2016 | ELECTRIC - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
11/17/2016 | PLUMBING - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/17/2016 | FRAMING | MRAMBER | Approved | IVRS - Inspection :* |
11/23/2016 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/23/2016 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* |
11/23/2016 | ELECTRIC - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
11/23/2016 | U VALUE FOR WINDOW | MRAMBER | Approved | IVRS - Inspection :* |
11/23/2016 | BUILDING ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
12/02/2016 | RIGHT OF WAY - FINAL | rolson | Approved | |
12/02/2016 | NPPO - FINAL | MRUSSO | Approved | |
12/02/2016 | SIGN - FINAL | MRUSSO | Approved | |
12/02/2016 | LANDSCAPE - FINAL | MRUSSO | Approved | |
12/02/2016 | ENGINEERING - FINAL | MRUSSO | Approved | NO EXTERIOR SITE WORK - APPROVED |
12/05/2016 | FIRE - ALARM FINAL | JPEELDAVIS | Approved | Provide documentation: IBC 2012, 717.3.3.2 Smoke damper actuation. The smoke damper shall close upon actuation of a listed smoke detector installed in accordance with Section 907.3 and one of the following methods, as applicable: 1) Where a smoke damper is installed within a duct, a smoke detector shall be installed in the duct within 5 feet (1524 mm) of the damper with no air outlets or inlets between the detector and the damper. The detector shall be listed for the air velocity, temperature and humidity anticipated at the point where it is installed. Other than in mechanical smoke control systems, dampers shall be closed upon fan shutdown where local detectors require a minimum velocity to operate. 2) Where a smoke damper is installed above smoke barrier doors in a smoke barrier, a spot type detector listed for releasing service shall be installed on either side of the smoke barrier door opening. 3) Where a smoke damper is installed within an air transfer opening wall, a spot type detector listed for releasing service shall be installed within 5 feet (1524 mm) horizontally of the damper. 4) Where a smoke damper is installed in a corridor wall or ceiling, the damper shall be permitted to be controlled by a smoke detection system installed in the corridor. 5) Where a total-coverage smoke detector system is provided within areas served by heating, ventilation and air conditioning (HVAC) system, smoke dampers shall be permitted to be controlled by the smoke detection system Provide Asbuilt drawings for fire alarm modifications |
12/07/2016 | FIRE SPKLR - FINAL | JPEELDAVIS | Approved | Asbuilts required. Provide documentation regarding head placement and type from designer. |
12/14/2016 | MECHANICAL - FINAL | mramber1 | Approved | |
12/14/2016 | MECHANICAL - HOOD SYSTEMS | mramber1 | Approved | |
12/14/2016 | MECHANICAL - HOODS | mramber1 | Approved | |
12/14/2016 | PLUMBING - FINAL | mramber1 | Approved | |
12/14/2016 | ELECTRIC - FINAL | mramber1 | Approved | |
12/14/2016 | BUILDING - FINAL | mramber1 | Approved | pending fire finals |
12/15/2016 | FIRE - KITCHEN EXH HOOD FINAL | JPEELDAVIS | Approved | |
12/19/2016 | FIRE - FINAL | kenb | Approved | The Fire Code Official is allowing a temporary approval for 30 days. I am requesting that the Architect of record clarify the location of fire dampers and fire smoke dampers on the drawings. I spoke to Joel at Stantec and it is confusing with the notes that were added to the Mechanical drawings and the comments from the building inspector, the location of the required fire dampers and smoke dampers. Plans need to be resubmitted indicating the exact location, how they are actuated and if non-required dampers were installed, then will they be removed or will they be powered in the open position. This temporary approval will expire on 1/19/2017 and the building shall be vacated if items are not satisfied. |