Permit Details

Status:
Final
Type:
Grading
Address NEW:
8640 E BROADWAY BL
Apply Date:
02/01/2012
Applicant:
N/A
Description:
GRADING - BERKSHIRE VILLAGE/WALMART
Contractors:
  • STRAIGHTLINE BUILDERS

Permit Reviews

Permit Number - T12BU00169
Permit Status: Final
Permit Description: GRADING - BERKSHIRE VILLAGE/WALMART
Start Date Submittal Complete Date Status  
02/01/2012 PLANS OK TO SUBMIT - GRADING 02/01/2012 COMPLETED Review Details
02/01/2012 GRADING 03/08/2012 COMPLETED Review Details
03/19/2012 RESUBMITTAL - GRADING ALL 09/14/2012 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T12BU00169
Permit Status: Final
Permit Description: GRADING - BERKSHIRE VILLAGE/WALMART
Total Outstanding Activity Conditions - 1
Date Name
02/01/2012 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T12BU00169
Permit Description: GRADING - BERKSHIRE VILLAGE/WALMART
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/17/2012 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) MET W/ SUPERINTENDENT (HARRY POLLEY/STRAIGHTLINE CONSTR) DISCUSSED PROJECT AND STORM WATER REQUIREMENTS.
2) ENSURE SEDIEMNT CONTROLS ARE INSTALLED PER YOUR SWPPP AND PHASING PLAN.
3) ENSURE TRACKING IS SWEPT OFF PUBLIC ROADWAYS ROUTINELY
4) ENSURE SEDIEMNT CONTROLS ARE INSP AND MAINTAINED PER YOUR SWPPP
5) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
11/02/2012 STORMWATER INSTALL OF CONTROLS MRUSSO Approved 1) SITE SPECIFIC SEDIMENT CONTROLS HAVE BEEN INSTALLED AND APPROVED.
2) DAILY STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
3) ENSURE ALL OFF SITE TRACKED SOIL IS SWEPT ON A ROUTINE BASIS.
4) A CONCRETE/MATERIALS WASH OUT IS ON SITE AND IS BEING USED.
5) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS OR ANY UNDERGROUND STORM WATER DRAINAGE INSTALLATION.
12/14/2012 STORMWATER FOLLOW-UP INSP MRUSSO Approved RAINING, NO ACTIVITY SEDIMENT CONTROLS IN PLACE
12/14/2012 GRADING - INTERMEDIATE MRUSSO Approved RAINING, NO ACTIVITY SEDIMENT CONTROLS IN PLACE
04/15/2013 STORMWATER FINAL INSPECTION MRUSSO Approved ENSURE (NOT) IS FILED WITH ADEQ
04/18/2013 LANDSCAPE INSPECTION MRUSSO Approved
04/18/2013 GRADING - FINAL MRUSSO Approved RECEIVED CERT STATEMENT FROM EOR AND AS-BUILT WILL BE SUBMITTED