Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2012 | STORMWATER INSTALL OF CONTROLS | Approved | 1) SITE SPECIFIC SEDIMENT CONTROLS HAVE BEEN INSTALLED AND APPROVED. 2) DAILY STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) ENSURE ALL OFF SITE TRACKED SOIL IS SWEPT ON A ROUTINE BASIS. 4) A CONCRETE/MATERIALS WASH OUT IS ON SITE AND IS BEING USED. 5) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS OR ANY UNDERGROUND STORM WATER DRAINAGE INSTALLATION. |