Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET W/ SUPERINTENDENT (HARRY POLLEY/STRAIGHTLINE CONSTR) DISCUSSED PROJECT AND STORM WATER REQUIREMENTS. 2) ENSURE SEDIEMNT CONTROLS ARE INSTALLED PER YOUR SWPPP AND PHASING PLAN. 3) ENSURE TRACKING IS SWEPT OFF PUBLIC ROADWAYS ROUTINELY 4) ENSURE SEDIEMNT CONTROLS ARE INSP AND MAINTAINED PER YOUR SWPPP 5) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED |