Permit: T11BU01121
Permit Details
Apply Date:
08/29/2011
Applicant:
PHILLIP CARHUFF
Description:
GRADING/SWPPP
Architects:
- CARHUFF, PHILIP ANDREW
Contractors:
- CANYON BUILDING AND DESIGN LLC *APA*
Outstanding Activity Conditions
Permit Number - T11BU01121
Permit Status: Expired
Permit Description: GRADING/SWPPP
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 08/29/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 09/18/2012 | See D12-0026. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T11BU01121
Permite Description: GRADING/SWPPP
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2013 | GRADING - FINAL | N/A | Continued | NO CONTACT NO CHANGES |
Completed Inspections
Permit Status: Expired
Permit Number: T11BU01121
Permit Description: GRADING/SWPPP
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2012 | NPPO PRE PERMIT INSPECTION | MRUSSO | Approved | 1)MET WITH SUPERINTENDENT (LOUIS VASQUEZ CANYON BLDG 471-2344) ON SITE, DISCUSSED STORM WATER REQ AND THE APPROVED GRADING PLAN. 2) INSTALL REMAINING WADDLE AROUND THE LOWER HALF OF THE EXCAVTION. 3) INSTALL A STABILIZED CONSTR ENTRANCE. 4) INSTALL A MATERIALS WASH OUT ON SITE 5) NEED TO INSPECT STORM PIPE INSTALL AND CATCH BASIN CONSTRUCTION PRIOR TO COVER 6) ENSURE YOU DOCUMENT YOUR STORM WATER SELF INSP 7) NPPO IMPLEMENTED PER PLAN |
| 12/12/2012 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1)MET WITH SUPERINTENDENT (LOUIS VASQUEZ CANYON BLDG 471-2344) ON SITE, DISCUSSED STORM WATER REQ AND THE APPROVED GRADING PLAN. 2) INSTALL REMAINING WADDLE AROUND THE LOWER HALF OF THE EXCAVTION. 3) INSTALL A STABILIZED CONSTR ENTRANCE. 4) INSTALL A MATERIALS WASH OUT ON SITE 5) NEED TO INSPECT STORM PIPE INSTALL AND CATCH BASIN CONSTRUCTION PRIOR TO COVER 6) ENSURE YOU DOCUMENT YOUR STORM WATER SELF INSP 7) NPPO IMPLEMENTED PER PLAN |
| 12/20/2012 | GRADING - INTERMEDIATE | MRUSSO | Approved | ROUGH GRADING TAKING PLACE. STORM WATER CONTROLS IN PLACE. NO COCNERNS AT THIS TIME |
| 01/28/2013 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | CONTRACTOR HAS INSTALLED WATTLE ALL ALONG THE NORTH END OF THE PERIMETER OF THIS SITE. THE ENDS OF THE WATTLE HAVE BEEN "HORSE SHOED" AROUND THE WEST AND EAST ENDS OF THE PROJECT. |
| 08/01/2013 | GRADING - TIER REV | jgreen | Approved | |
| 08/30/2013 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | SITE IS STABILIZED, ENSURE TO SEND IN YOUR NOTICE OF TERMINATION (NOT) TO ADEQ. |
| 08/30/2013 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved |