Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: NPPO PRE PERMIT INSPECTION
Permit Number - T11BU01121
Inspection Description - NPPO PRE PERMIT INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2012 | NPPO PRE PERMIT INSPECTION | Approved | 1)MET WITH SUPERINTENDENT (LOUIS VASQUEZ CANYON BLDG 471-2344) ON SITE, DISCUSSED STORM WATER REQ AND THE APPROVED GRADING PLAN. 2) INSTALL REMAINING WADDLE AROUND THE LOWER HALF OF THE EXCAVTION. 3) INSTALL A STABILIZED CONSTR ENTRANCE. 4) INSTALL A MATERIALS WASH OUT ON SITE 5) NEED TO INSPECT STORM PIPE INSTALL AND CATCH BASIN CONSTRUCTION PRIOR TO COVER 6) ENSURE YOU DOCUMENT YOUR STORM WATER SELF INSP 7) NPPO IMPLEMENTED PER PLAN |