Inspection History Details
Inspection Status: Approved
Inspection History: NPPO PRE PERMIT INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2012 | NPPO PRE PERMIT INSPECTION | Approved | 1)MET WITH SUPERINTENDENT (LOUIS VASQUEZ CANYON BLDG 471-2344) ON SITE, DISCUSSED STORM WATER REQ AND THE APPROVED GRADING PLAN. 2) INSTALL REMAINING WADDLE AROUND THE LOWER HALF OF THE EXCAVTION. 3) INSTALL A STABILIZED CONSTR ENTRANCE. 4) INSTALL A MATERIALS WASH OUT ON SITE 5) NEED TO INSPECT STORM PIPE INSTALL AND CATCH BASIN CONSTRUCTION PRIOR TO COVER 6) ENSURE YOU DOCUMENT YOUR STORM WATER SELF INSP 7) NPPO IMPLEMENTED PER PLAN |