Permit: T11BU01121

Parcel: 11521010E


Addresses:

1900 W SPEEDWAY BL

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
08/30/2013 ENGINEERING PRE-CONSTRUCTION Approved
12/12/2012 ENGINEERING PRE-CONSTRUCTION Continued 1)MET WITH SUPERINTENDENT (LOUIS VASQUEZ CANYON BLDG 471-2344) ON SITE, DISCUSSED STORM WATER REQ AND THE APPROVED GRADING PLAN.
2) INSTALL REMAINING WADDLE AROUND THE LOWER HALF OF THE EXCAVTION.
3) INSTALL A STABILIZED CONSTR ENTRANCE.
4) INSTALL A MATERIALS WASH OUT ON SITE
5) NEED TO INSPECT STORM PIPE INSTALL AND CATCH BASIN CONSTRUCTION PRIOR TO COVER
6) ENSURE YOU DOCUMENT YOUR STORM WATER SELF INSP
7) NPPO IMPLEMENTED PER PLAN
12/06/2012 ENGINEERING PRE-CONSTRUCTION Continued DEMO WORK HAS STARTED ON SITE NO STORM WATER OR GRADING CONCERNS AT THIS TIME