Permit Details

Status:
Final
Type:
Grading and SWPPP
Address:
5301 E GRANT RD
Apply Date:
05/10/2011
Applicant:
WOLFARTH, KIM EDWARD
Description:
GRADING/SWPPP
Contractors:
  • J E D CONSTRUCTION COMPANY ,

Permit Reviews

Permit Number - T11BU00620
Permit Status: Final
Permit Description: GRADING/SWPPP
Start Date Submittal Complete Date Status  
08/22/2011 RESUBMITTAL - GRADING 08/25/2011 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T11BU00620
Permit Status: Final
Permit Description: GRADING/SWPPP
Total Outstanding Activity Conditions - 1
Date Name
05/10/2011 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T11BU00620
Permit Description: GRADING/SWPPP
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/27/2011 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) ENSURE SEDIMENT CONTROLS ARE INSTALLED PER YOUR STORM WATER PLAN.
2) ENSURE CONTROLS INSTALLED ARE MAINTAINED THROUGHOUT THE PROJECT.
3) ENSURE STABILIZED CONSTRUCTION ENTRANCES/EXITS ARE INSTALLED AND MAINTAINED WHERE APPLICABLE.
4) POSTA A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE.
5) DOCUMENT YOUR REQUIRED STORM WATER SELF INSPECTIONS.
6) INSTALL A CONCRETE / MATERIALS WASH OUT WHEN APPLICABLE
7) SWEEP UP TRACKING ROUTINELY
11/28/2011 STORMWATER FOLLOW-UP INSP MRUSSO Approved 1) INSPECTED CULVERT CROSSING AT CHILLER PLANT ALONG NORTH SIDE OF HOSPITAL. PIPE HAS BEEN INSTALLED PER PLAN.
2) INSPECTED NEW PARKING AREA ALONG NORTH SIDE OF HOSPITAL. PARKING AREA CONSTRUCTED PER APPROVED PLANS.
3) CONTRACTOR PREPING AREA ALONG NE CORNER OF SITE FOR DRAINAGE IMPROVEMENTS AND ROAD EXPANSION.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
05/19/2012 GRADING - FINAL MRUSSO Approved CONTRACTOR WANTS TO FINAL GRADING PERMIT FOR EAST SIDE CONSTRUCTION.

ENSURE APPROVED DRAWINGS MATCH WHAT WAS CONSRTUCTED ON SITE.
PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE WORK AND STORM WATER DRAINAGE WAS CONSTRUCTED PER THE APPROVED PLANS.
08/22/2012 GRADING - CHECK FOR ACTIVITY RLEDONNE Approved WALKED NEW PARKING AREA ON SOUTH SIDE OF NEW BUILDING.
12/21/2012 GRADING - INTERMEDIATE RLEDONNE Approved STARTING GRADING WORK ON SOUTH OF NEW BUILDING.
03/26/2013 STORMWATER FINAL INSPECTION RLEDONNE Approved
04/26/2013 GRADING - TIER REV eleibol1 Approved As-builts received 25APR13 - show stormdrain in place. EOR stated 26APR13 that concrete was placed to provide sufficient cover at lower end of pipe, Substantial Completion letter to be submitted. Existing T11BU00620 Reseeding Bond posted by JE Dunn for West Campus shall remain in place for D11-0014 & T11BU00620, until remaining West Campus improvements are completed, inspected, and approved by the City. Railing at north end of West Pavilion bldg shall be installed prior to CofO.
11/01/2013 GRADING - REBAR DROBERTS Approved
11/01/2013 STORMWATER INSTALL OF CONTROLS DROBERTS Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW
FILE5.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW
BOND RELEASE2013_10_6.PDF DOCUMENTS VIEW