Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2013 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 09/27/2011 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) ENSURE SEDIMENT CONTROLS ARE INSTALLED PER YOUR STORM WATER PLAN. 2) ENSURE CONTROLS INSTALLED ARE MAINTAINED THROUGHOUT THE PROJECT. 3) ENSURE STABILIZED CONSTRUCTION ENTRANCES/EXITS ARE INSTALLED AND MAINTAINED WHERE APPLICABLE. 4) POSTA A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE. 5) DOCUMENT YOUR REQUIRED STORM WATER SELF INSPECTIONS. 6) INSTALL A CONCRETE / MATERIALS WASH OUT WHEN APPLICABLE 7) SWEEP UP TRACKING ROUTINELY |