Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2013 | GRADING - FINAL | Approved | APPPROVED PER ELIZABETHS NOTES. | |
| 04/26/2013 | GRADING - FINAL | Continued | WALKED SITE WITH NEW GC . NEED AP AS-BUILTS AND CERT LETTER FOR FINAL. | |
| 04/24/2013 | GRADING - FINAL | Continued | DRIVE WAY ON SOUTH SIDE OF BUILDING NOT OPEN . | |
| 04/10/2013 | GRADING - FINAL | Continued | WORKING ON LAST COAT OF PAVING. | |
| 04/08/2013 | GRADING - FINAL | Continued | WORKING ON STREET WEST OF NEW BUILDING AND ON CATCH BASINS. | |
| 04/05/2013 | GRADING - FINAL | Not ready for Inspection | STILL WORKING ON CATCH BASINS. NEED TO EXTEND PIPING FROM BUILDING IN TO BASIN. | |
| 04/04/2013 | GRADING - FINAL | Not ready for Inspection | WORKING ON NEW CATCH BASIN ON SOUTH SIDE OF NEW BUILDING. | |
| 04/03/2013 | GRADING - FINAL | Continued | WORKING ON NEW CATCH BASIN SOTH OF NEW BUILDING. | |
| 03/28/2013 | GRADING - FINAL | Continued | WALKED SITE WITH GC LOOKED AT NEW STROM PIPING 18" PVC C 905 UNDER STREET COVER IS ONLY AT 10". POVIDE LISTING FOR C905. PIPING INSTALLED BACK FROM OUT LET TO NEW CATCH BASIN. | |
| 03/26/2013 | GRADING - FINAL | Continued | ||
| 02/26/2013 | GRADING - FINAL | Denied | ||
| 05/19/2012 | GRADING - FINAL | Continued | CONTRACTOR WANTS TO FINAL GRADING PERMIT FOR EAST SIDE CONSTRUCTION. ENSURE APPROVED DRAWINGS MATCH WHAT WAS CONSRTUCTED ON SITE. PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE WORK AND STORM WATER DRAINAGE WAS CONSTRUCTED PER THE APPROVED PLANS. |