Permit Details

Status:
Expired
Type:
Grading and SWPPP
Address NEW:
1690 W IRVINGTON RD
Apply Date:
09/16/2010
Applicant:
STAR CONSULTING
Description:
GRADING FOR NEW CHARTER HIGH SCHOOL (PIMA ROSE ACADEMY)
Architects:
  • MEYER, JAMES CHAUNCEY
Contractors:
  • CHESTNUT CONSTRUCTION CORPORATIO

Permit Reviews

Permit Number - T10BU01437
Permit Status: Expired
Permit Description: GRADING FOR NEW CHARTER HIGH SCHOOL (PIMA ROSE ACADEMY)
Start Date Submittal Complete Date Status  
09/16/2010 PLANS OK TO SUBMIT - GRADING 09/16/2010 COMPLETED Review Details
09/16/2010 GRADING 10/27/2010 COMPLETED Review Details
11/09/2010 RESUBMITTAL - GRADING ALL 12/02/2010 COMPLETED Review Details
12/02/2010 RESUBMITTAL - GRADING 12/02/2010 ACTIVE Review Details

Outstanding Activity Conditions

Permit Number - T10BU01437
Permit Status: Expired
Permit Description: GRADING FOR NEW CHARTER HIGH SCHOOL (PIMA ROSE ACADEMY)
Total Outstanding Activity Conditions - 1
Date Name
09/16/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Expired
Permit Number: T10BU01437
Permite Description: GRADING FOR NEW CHARTER HIGH SCHOOL (PIMA ROSE ACADEMY)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/26/2011 STORMWATER FOLLOW-UP INSP N/A Continued STOCK PILE MOVED FROM LOT TO THE WEST OF JOB SITE NEED TO HYDRO SEED.

Completed Inspections

Permit Status: Expired
Permit Number: T10BU01437
Permit Description: GRADING FOR NEW CHARTER HIGH SCHOOL (PIMA ROSE ACADEMY)
Total Completed Inspections - 7
Date Description Inspector Results Comments
12/09/2010 GRADING - CHECK FOR ACTIVITY JFEMLING Approved No activity at this time, construction trailer onsite.
01/19/2011 ENGINEERING PRE-CONSTRUCTION JFEMLING Approved Held pre-con with Chestnut COnstruction, discussed access routes, PAAL widths, SWPPP controls and water harvest areas.
08/19/2011 LANDSCAPE INSPECTION DROBERTS Approved APPROVED AS NOTED ON THE PREVIOUS INSPECTION DONE BY RON LE DONNE.
08/19/2011 GRADING - REBAR DROBERTS Approved
09/13/2011 STORMWATER INSTALL OF CONTROLS RLEDONNE Approved WORKING ON RIP RAP AT DRAINS.
09/22/2011 GRADING - INTERMEDIATE RLEDONNE Approved CHESTNUT BACK ON SITE TO COMPLET ALL WORK PER BOBBY.
09/26/2011 GRADING - TIER REV RLEDONNE Approved

Documents

File Name Document Type  
001_1 OF 3.TIF GRADING PLANS VIEW
002_2 OF 3.TIF GRADING PLANS VIEW
003_3 OF 3.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
CERTIFICATION LETTER 2011_08_18.PDF DOCUMENTS VIEW
CASH BOND 2010_12_02.PDF DOCUMENTS VIEW