Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2011 | ENGINEERING PRE-CONSTRUCTION | Approved | Held pre-con with Chestnut COnstruction, discussed access routes, PAAL widths, SWPPP controls and water harvest areas. |