Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T10BU01213
Permit Details
Apply Date:
07/29/2010
Applicant:
SAYLER BROWN ARCHITECTS/PLANNER
Description:
GRADING: NEW RETAIL
Architects:
- SAYLER BROWN ARCHITECTS/PLANNER
Contractors:
- TRIUMPH BUILDERS SOUTHWEST LLC *C*
Permit Reviews
Permit Number - T10BU01213
Permit Status: Final
Permit Description: GRADING: NEW RETAIL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/15/2010 | RESUBMITTAL - GRADING | 09/22/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01213
Permit Status: Final
Permit Description: GRADING: NEW RETAIL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/29/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01213
Permit Description: GRADING: NEW RETAIL
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/05/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. CONTRACTOR MUST ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. CONTRACTOR MUST PERFORM PERIODIC SELF INSPECTIONS PER THE APPROVED SWPPP. |
10/25/2010 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED AND ARE BEING MANAGED BY A PRIVATE STORM WATER CONSULTING COMPANY. |
12/10/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
12/10/2010 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | FOLLOW UP INSPECTION PERFORMED, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. GROUTED ROCK RIP RAP W/TOE DOWN HAS BEEN INSTALLED ALONG EAST WALL OF WEST BASIN NEXT TO ORACLE ROAD. |
03/08/2011 | GRADING - REBAR | JFEMLING | Approved | Rebar for dumpster pad OK. |
05/13/2011 | RAINWATER - FINAL | MRUSSO | Approved | |
05/13/2011 | RAINWATER - INTERMEDIATE | MRUSSO | Approved | |
05/13/2011 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
06/06/2011 | GRADING - TIER REV | MRUSSO | Approved | |
06/06/2011 | GRADING - FINAL | MRUSSO | Approved | ALL CONCERNS ASSOCIATED WITH THE WEST RET/DET BASIN WILL BE ADDRESSED DURING THE CONSTRUCTION OF BLDG #11. |
06/14/2011 | PERMIT FINALED | KMEDINA | Approved | |
05/17/2019 | GRADING - CHECK FOR ACTIVITY | RLEDONNE | Approved |