Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T10BU01213
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/05/2010 | ENGINEERING PRE-CONSTRUCTION | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. CONTRACTOR MUST ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. CONTRACTOR MUST PERFORM PERIODIC SELF INSPECTIONS PER THE APPROVED SWPPP. |
|
09/30/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1) A STABILIZED CONSTRUCTION ENTRANCE HA BEEN INSTALLED. 2) CONTRACTOR MAY NEED TO INSTALL TWO ENTRANCE/EXITS BEING USED ON SITE IN ORDER TO REDUCE TRACKING OF SOIL. 3) SWEEP UP TRACKED SOIL OFF OF EXISTING PARKING AREA 4) THE EXISTING RET/DET BASIN ALONG THE WEST PERIMETER HAS BEEN SILTED - IN AND WILL NEED TO BE RE-CONSTRUCTED PER PLAN. 5) PLACE SEDIMENT CONTROLS AT ALL CURB CUTS, WALL OPENINGS, AND DRAINAGE STRUCTURE OUTLETS. 6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM. 7) INSTALL A CONCRETE/ MATERIALS WASH-OUT WHEN APPLICABLE |
|
09/28/2010 | ENGINEERING PRE-CONSTRUCTION | Correction Required | CONSTRUCTION SITE IS IN NON-COMPLIANCE WITH NPDES/AZPDES/ AND THE COT STORM WATER ODINANCE. 1) INSTALL AND MAINTAIN SEDIMENT CONTROLS REQUIRED BY YOUR STORM WATER PLAN. 2) CALL IN FOR AN ENGINEERING PRE-CONSTRUCTION MEETING PRIOR TO CONSTRUCTION. 3) CALL FOR INSPECTION FOR COMPLIANCE WHEN COMPLETED. |