Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Grading
Address NEW:
5123 E SPEEDWAY BL
Apply Date:
07/16/2010
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
GRADING FOR NEW RETAIL BUILDING
Architects:
  • ACORN, KIM BRIAN
Contractors:
  • CORNERSTONE HOMES LLC

Permit Reviews

Permit Number - T10BU01133
Permit Status: Final
Permit Description: GRADING FOR NEW RETAIL BUILDING
Start Date Submittal Complete Date Status  
04/18/2011 REVISION - GRADING 04/29/2011 COMPLETED Review Details
04/29/2011 REVISION - GRADING 06/06/2011 COMPLETED Review Details
07/16/2010 PLANS OK TO SUBMIT - GRADING 07/16/2010 COMPLETED Review Details
07/16/2010 GRADING 08/11/2010 COMPLETED Review Details
08/10/2011 REVISION - GRADING 08/30/2011 COMPLETED Review Details
08/24/2010 RESUBMITTAL - GRADING ALL 09/22/2010 COMPLETED Review Details
08/30/2011 REVISION - GRADING 09/14/2011 COMPLETED Review Details
11/22/2010 RESUBMITTAL - GRADING ALL 01/07/2011 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10BU01133
Permit Status: Final
Permit Description: GRADING FOR NEW RETAIL BUILDING
Total Outstanding Activity Conditions - 1
Date Name
07/16/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU01133
Permit Description: GRADING FOR NEW RETAIL BUILDING
Total Completed Inspections - 11
Date Description Inspector Results Comments
01/25/2011 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved MET W/ SUPINTENDENT (CRIS NORMAN 289-5745) , SITE IS .96 ACRES NO STORM WATER PERMIT REQUIRED.
A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED ALONG SPEEDWAY IN ORDER TO REDUCE TRACKING AND THE SITE IS FENCED.
NO MAJOR STORM WATER DRAINAGE ISSUES W/ PROJECT. SITE MOSTLY SURFACE DRAINS INTO SMALL WATER HARVESTING AREAS TOWARD THE NORTH SIDE OF THE SITE.
CONTRACTOR MUST ENSURE DISTURBED SOIL FROM CONSTRUCTION STAYS ON SITE.
10/13/2011 GRADING - INTERMEDIATE MRUSSO Approved
10/13/2011 STORMWATER FOLLOW-UP INSP MRUSSO Approved
10/13/2011 RAINWATER - FINAL MRUSSO Approved
10/13/2011 GRADING - FINAL MRUSSO Approved
10/13/2011 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
10/13/2011 GRADING - TIER REV MRUSSO Approved
10/13/2011 LANDSCAPE INSPECTION MRUSSO Approved
11/17/2011 PERMIT FINALED KMEDINA Approved
06/17/2019 RAINWATER - INTERMEDIATE RLEDONNE Approved
06/17/2019 GRADING - REBAR RLEDONNE Approved

Documents

File Name Document Type  
001_C1.TIF GRADING PLANS VIEW
002_C2.TIF GRADING PLANS VIEW
003_C3.TIF GRADING PLANS VIEW
004_C4.TIF GRADING PLANS VIEW
005_L1.TIF GRADING PLANS VIEW
006_L2.TIF GRADING PLANS VIEW
007_L3.TIF GRADING PLANS VIEW
008_L4.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW