Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T10BU01133
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/26/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | PDSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Window Depot T10BU01133 Grading Plan (2nd Review) TRANSMITTAL DATE: August 25, 2010 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not approve the grading plan until the site plan has been approved. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t10bu01133 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Grading plan and a copy of the approved site plan |
| 08/30/2010 | ANDREW CONNOR | NPPO | REVIEW | Denied | Ensure that all Engineering comments and concerns are addressed prior NPP / Landscape approval stamp. |
| 09/08/2010 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 09/08/2010, Drainage Report: 1. Is the proposed 10' building setback from waterharvesting recommended by the geotechnical engineer? Provide a revised Geotechnical Report that addresses building setback from ponding water and revise the drainage report accordingly. Additionally, it appears that bicycle parking racks are proposed within the waterharvesting area south of the proposed building. Will the racks interfere with the basin? 2. The roof drainage directions shown on the drainage exhibit appear to be different from the direction shown on the Site/Grading plan. Provide consistent information on both documents. 3. Show, on the drainage exhibit, the proposed spot elevations/contour lines including within all waterharvesting basins. 4. Clarify if the site is impacted by drainage from the parcel to the west. 5. Show on the drainage exhibit all proposed drainage solutions/structures with all required details (i.e. type, materials, location, size and dimensions, slopes, grades, scuppers, high and low points, water ponding and slope setback lines, cross section locations and details, etc.) that would clarify how the proposed drainage scheme will work. The drainage information shown on the development plan and grading plan will be based on the information provided in the drainage report text and drainage exhibits. 6. The CD that was attached to the submittal was broken. Resubmit another copy. Site/Grading Plan: 1. Provide the recordation documents that verify the abandonment of the all easements proposed to be abandoned. 2. Provide documentation which verifies that lot combination has been processed and completed. 3. Show the existing contours west of the proposed building to verify that offsite drainage will not impact the subject project from the west. 4. Provide written verification from COT Environmental Services that garbage collection can be in the alley without the need for onsite trash enclosure. 5. Provide any required sidewalk scuppers that might be needed to convey roof drainage underneath the concrete walkway next to the building. 6. Show the required setback from the waterharvesting basin, south of the proposed building. The setback shall be in accordance with the recommendation of the geotechnical report. 7. Add the following general grading note: " CALL FOR PRE-CONSTRUCTION MEETINGS. FOR A DSD ENGINEERING INSPECTIONS, CALL IVR (740-6970), OR SCHEDULE WITH A CUSTOMER SERVICE REPRESENTATIVE AT THE DEVELOPMENT SERVICES DEPARTMENT, OR CONTACT DSD ENGINEERING AT 791-5550 EXTENSION 2101, OR SCHEDULE INSPECTIONS ONLINE AT: http://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML. 8. Revise the Site/Grading Plan in accordance with the drainage report revisions. Landscape Plan: The Landscape Plan is acceptable pertaining to Engineering and Floodplain Review. |