Permit: T10BU01133

Parcel: 12112060B


Addresses:

5123 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
01/25/2011 ENGINEERING PRE-CONSTRUCTION Approved MET W/ SUPINTENDENT (CRIS NORMAN 289-5745) , SITE IS .96 ACRES NO STORM WATER PERMIT REQUIRED.
A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED ALONG SPEEDWAY IN ORDER TO REDUCE TRACKING AND THE SITE IS FENCED.
NO MAJOR STORM WATER DRAINAGE ISSUES W/ PROJECT. SITE MOSTLY SURFACE DRAINS INTO SMALL WATER HARVESTING AREAS TOWARD THE NORTH SIDE OF THE SITE.
CONTRACTOR MUST ENSURE DISTURBED SOIL FROM CONSTRUCTION STAYS ON SITE.
01/24/2011 ENGINEERING PRE-CONSTRUCTION Continued NO CONTACT/SUPINTENDENT NOT ON SITE (CRIS NORMAN 289-5745/CORNERSTONE HOMES) WILL MEET NEXT WEEK.

SITE GRADING HAS STARTED PRIOR TO PRE-CON MEETING