Permit Details

Status:
Final
Type:
Grading and SWPPP
Apply Date:
04/21/2010
Applicant:
N/A
Description:
GRADING:PHASE II
Architects:
  • MASSE, PAUL H
Contractors:
  • FOUR LEAF CONSTRUCTION INC

Permit Reviews

Permit Number - T10BU00665
Permit Status: Final
Permit Description: GRADING:PHASE II
Start Date Submittal Complete Date Status  
04/14/2011 REVISION - GRADING 04/26/2011 COMPLETED Review Details
04/21/2010 RESUBMITTAL - GRADING ALL 05/13/2010 COMPLETED Review Details
05/18/2010 RESUBMITTAL - GRADING ALL 06/03/2010 COMPLETED Review Details
06/03/2010 RESUBMITTAL - GRADING 06/18/2010 COMPLETED Review Details
06/18/2010 RESUBMITTAL - GRADING 06/29/2010 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T10BU00665
Permit Status: Final
Permit Description: GRADING:PHASE II
Total Outstanding Activity Conditions - 1
Date Name
04/21/2010 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T10BU00665
Permit Description: GRADING:PHASE II
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/07/2010 GRADING - CHECK FOR ACTIVITY MRUSSO Approved SITE IS UNDER CONSTRUCTION, WILL MEET WITH SUPERINTENDENT. NO PRE-CON CALLED IN
10/20/2010 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) CONSTRUCTION STARTED ON PHASE ii OF PROJECT.
2) APPROVED GRADING PLAN AND PERMIT IS ON SITE.
3) SITE IS NOT UNDER A SWPPP DUE TO THE FACT THAT IT IS A REMODEL PROJECT DISTURBING < 1 AC; HOWEVER CONTRACTOR MUST ENSURE DISTURBED SOIL IS KEPT ON SITE.
4) CALL FOR INSPECTION IF YOU HAVE ANY SITE QUESTIONS CONCERNS AND/OR CHANGES.
10/27/2010 GRADING - TIER REV MRUSSO Approved SIGNIFICANT CHANGES TO STORM WATER DRAINAGE SHOWN ON THE APPROVED GRADING PLAN. PROVIDE AN APPROVED REVISION SHOWING CHANGES MADE.

1) CONTRACTOR INSTALLED 10" PVC IN PLACE OF 12" PVC PIPE AS SHOWN ON APPROVED GRADING PLAN.
2) CONTRACTOR REPLACED 12" PVC PIPE TEE'S AND RISERS W/ 8" PVC DUE TO REQUIRED ELEVATION OF AREA DRAINS SHOWN ON PLANS.
3) CONTRACTOR PROVIDED A LEVEL IN ORDER TO SHOOT ELEVATIONS OF PIPE AND SHOW THE REQUIRED .7 FEET OF FALL IN 400' OF STORM PIPE. ELEV. SHOT'S TAKEN SHOW POSITIVE DRAINAGE IN PIPE (.6').
4) CONTRACTOR CHANGED LOCATION OF SOME OF THE STORM DRAIN PIPE.
5) PRIOR TO FIELD APPROVAL THE CONTRACTOR MUST PROVIDE AN APPROVED PLAN SHOWING CHANGES MADE W/ THE ENG OF RECORD STAMP AND THE COT APPROVAL.
6) OK TO BURY PIPE AS SOON AS CHANGES ARE APPROVED.
10/27/2010 GRADING - INTERMEDIATE MRUSSO Approved SIGNIFICANT CHANGES TO STORM WATER DRAINAGE SHOWN ON THE APPROVED GRADING PLAN.

1) CONTRACTOR INSTALLED 10" PVC IN PLACE OF 12" PVC PIPE AS SHOWN ON APPROVED GRADING PLAN.
2) CONTRACTOR REPLACED 12" PVC PIPE TEE'S AND RISERS W/ 8" PVC DUE TO REQUIRED ELEVATION OF AREA DRAINS SHOWN ON PLANS.
3) CONTRACTOR PROVIDED A LEVEL IN ORDER TO SHOOT ELEVATIONS OF PIPE AND SHOW THE REQUIRED .7 FEET OF FALL IN 400' OF STORM PIPE. ELEV. SHOT'S TAKEN SHOW POSITIVE DRAINAGE IN PIPE (.6').
4) CONTRACTOR CHANGED LOCATION OF SOME OF THE STORM DRAIN PIPE.
5) PRIOR TO FIELD APPROVAL THE CONTRACTOR MUST PROVIDE AN APPROVED PLAN SHOWING CHANGES MADE W/ THE ENG OF RECORD STAMP AND THE COT APPROVAL.
6) OK TO BURY PIPE AS SOON AS CHANGES ARE APPROVED.
12/28/2010 STORMWATER FOLLOW-UP INSP MRUSSO Approved NO STORM WATER CONCERNS AT THIS TIME.
12/28/2010 STORMWATER INSTALL OF CONTROLS MRUSSO Approved
04/28/2011 STORMWATER FINAL INSPECTION MRUSSO Approved
04/28/2011 GRADING - FINAL MRUSSO Approved RECEIVED STORM DRAINAGE CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL RET/DET AND DRAINAGEWAYS WERE SUBSTANTIALLY COMPLETED PER THE APPROVED PLAN.
05/20/2011 PERMIT FINALED KMEDINA Approved
06/28/2019 GRADING - REBAR RLEDONNE Approved

Documents

File Name Document Type  
001_SHEET 1 OF 3.TIF GRADING PLANS VIEW
002_SHEET 2 OF 3.TIF GRADING PLANS VIEW
003_SHEET 3 OF 3.TIF GRADING PLANS VIEW
004_SHEET 1 OF 2.TIF GRADING PLANS VIEW
005_SHEET 2 OF 2.TIF GRADING PLANS VIEW
006_LS-1.TIF GRADING PLANS VIEW
007_LS-2.TIF GRADING PLANS VIEW
008_LS-3.TIF GRADING PLANS VIEW
001_C-1.TIF GRADING PLANS VIEW
002_C-2.TIF GRADING PLANS VIEW
003_C-3.TIF GRADING PLANS VIEW
004_C-4.TIF GRADING PLANS VIEW
005_C-5.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW
CERTIFICATION LETTER 2011_04_14PDF DOCUMENTS VIEW
None DOCUMENTS VIEW