Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2011 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/03/2011 | STORMWATER FOLLOW-UP INSP | Continued | SITE BEING PAVED, CURB BEING POURED. NO SIGNIFICANT CONCERNS AT THIS TIME. SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS. NO OTHER STORM WATER CONCERNS AT THIS TIME |
|
| 01/07/2011 | STORMWATER FOLLOW-UP INSP | Continued | ENSURE SLOPES ON ACCES WAYS AND SIDEWALKS ARE <5%. SOME SIDEWALKS BEING POURED, CONTRACTOR MOSTLY WORKING ON BLDGS. 1) SWEEP UP TRACKING OFF OF FAIRVIEW MORE OFTEN. 2) ENSURE STOR WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED UNTIL THE SITE IS STABILIZED. 3) USE CONCRETE WASH OUT WHEN POURING CURBS AND WALKWAYS |
|
| 12/28/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. | |
| 12/08/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SITE WORK BEING DONE AT THIS TIME, VERTICAL CONSTRUCTION, UTILITIES AND SOME DIRT WORK BEING DONE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CALL FOR RE-INSPECTION FOR ANY REVISIONS/CHANGES TO THE ORIGINAL SITE/GRADING PLAN. |
|
| 10/27/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |