Permit: T09CM02678
Permit Details
Apply Date:
10/05/2009
Applicant:
N/A
Description:
TI:RETAIL
Architects:
- RAWSON, RHONDA LEE
Contractors:
- DESERT WEST COMMERCIAL L L C
Permit Reviews
Permit Number - T09CM02678
Permit Status: C of o
Permit Description: TI:RETAIL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2010 | REVISION - - 1ST | 01/27/2010 | COMPLETED |
01/27/2010 | REVISION - - 2ND | 01/27/2010 | COMPLETED |
02/02/2010 | REVISION - - 3RD | 02/02/2010 | COMPLETED |
10/05/2009 | COMMERCIAL TI | 11/03/2009 | COMPLETED |
10/05/2009 | SITE | 10/06/2009 | COMPLETED |
10/06/2009 | SITE | 11/03/2009 | COMPLETED |
11/03/2009 | RESUBMITTAL - SITE | 11/05/2009 | COMPLETED |
11/03/2009 | COMMERCIAL TI | 11/05/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM02678
Permit Status: C of o
Permit Description: TI:RETAIL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/05/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T09CM02678
Permit Description: TI:RETAIL
Total Completed Inspections - 28
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2009 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* 1) OK TO TAPE ONE SIDE REAR WALL AND FITTING ROOMS |
11/13/2009 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
11/24/2009 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE APPROVED DRAINAGE FITTINGS, SUPPORT OVERHADE PIPING AT CORRECT INTERVALS. INSTALL PER APPROVED PLAN OR MINIMUM RED LINE ALL CHANGES, PROVIDE WATER HAMMER ARRESTORS FOR QUICK CLOSING VALVES 2) PROVIDE DRAINAGE FITTING FOR URINAL 3) HAVE A PLUMBER ON SITE FOR NEXT INSPECTION OR YOU WILL BE REFEE'D |
11/24/2009 | PLUMBING - PRE SLAB | RRICH | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) SUPPORT PIPING FOR TRAP PRIMERS |
11/24/2009 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* 1) UNDERGROUND WATER TEST ONLY OK PENDING RED LINES OF ACTUAL INSTALLATION ON SITE. SEE RISER DIAGRAM P-1 |
01/07/2010 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* |
01/20/2010 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
01/21/2010 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* |
01/21/2010 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
01/21/2010 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
01/21/2010 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
01/25/2010 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
01/28/2010 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
02/08/2010 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) 14 PSI TEST IS OK 2) AIR BALANCE OK |
02/08/2010 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
02/08/2010 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* |
02/08/2010 | STEM WALL/RETAINING WALL | GDABBS | Approved | IVRS - Inspection :* |
02/08/2010 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | |
02/08/2010 | FIRE - FINAL | CSCHULTZ | Approved | |
02/08/2010 | NPPO - FINAL | JLINVILLE | Approved | N/A |
02/08/2010 | LANDSCAPE - FINAL | JLINVILLE | Approved | N/A |
02/25/2010 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | 1) LOADING DOCK RAMP AS PER DETAIL #3, PAGE A1/A-OK TO POUR PROGRESS AREA |
03/09/2010 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
03/09/2010 | ENGINEERING - FINAL | JFEMLING | Approved | COntractor will complete the following items 1) Sweep and remove dirt and silt from parking areas at rear of building. 2) Drill holes to hold opens trash encloser doors 3) remove asphalt debris from behinf CMU wall. 4) install cap on water valve riser. 5) Install sump pump in ramp CB. |
03/10/2010 | BUILDING - PROGRESS | JBURGE | Approved | |
03/10/2010 | BUILDING ABOVE CEILING | JBURGE | Approved | |
03/25/2010 | SIGN - FINAL | RJIROUDE | Approved |