Permit: T09CM00583
Permit Details
Apply Date:
03/13/2009
Applicant:
N/A
Description:
NEW:CONVENIECE STORE #1453
Architects:
- FILUK, DANIEL DIMITRI
Contractors:
- LANG WYATT CONSTRUCTION ,
Permit Reviews
Permit Number - T09CM00583
Permit Status: C of o
Permit Description: NEW:CONVENIECE STORE #1453
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/13/2009 | PLANS OK TO SUBMIT - COMM | 03/13/2009 | COMPLETED |
| 03/13/2009 | COMMERCIAL NEW | 03/31/2009 | COMPLETED |
| 08/21/2009 | RESUBMITTAL | 09/09/2009 | COMPLETED |
| 09/09/2009 | RESUBMITTAL | 10/06/2009 | COMPLETED |
| 12/23/2009 | REVISION - - 1ST | 12/23/2009 | COMPLETED |
| 12/29/2009 | REVISION - - 2ND | 12/29/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09CM00583
Permit Status: C of o
Permit Description: NEW:CONVENIECE STORE #1453
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/13/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T09CM00583
Permit Description: NEW:CONVENIECE STORE #1453
Total Completed Inspections - 43
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2009 | ELECTRIC - UFER | RJIROUDE | Approved | IVRS - Inspection : See detailed listing on site.| 999* NO ACCESS TRAILER LOCKED FOOTING POURED BEFORE INSPECTION INSTALL FEEDER TO TRAILER FROM GENERATOR PER CODE. INSTALL GROUNDING ELECTRODE SYSTEM @ GENERATOR & TRAILER PER CODE |
| 11/03/2009 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* 1) GW AND SANITRARY THRU BLDG TO TIE TOGETHER ON WEST SIDE, MINUS INTERCEPTOR INSTALL-INTERCEPTOR VENT IS INSTALLED 2) WATER TEST OK-WILL NEED TO RETEST UNDEGROUND THRU ROO FOR ALL JOINTS BEING TESTED |
| 11/06/2009 | PLUMBING - PRE SLAB | RRICH | Approved | 1) SEE NOTE 'J' PAGE P1.1 FOR CORRECT WATER INSTALLATION |
| 12/09/2009 | PLUMBING - ROOF DRAINS | RMYERS | Approved | IVRS - Inspection :* 1) WATER TEST OK 2) N/H CAST IRON REQUIRES HANGERS WITHIN 18" OF EACH COUPLING ON EACH SITE |
| 12/10/2009 | REINFORCED MASONRY PRE-GROUT | GDABBS | Approved | IVRS - Inspection :* 1) CMU NORTH TO SOUTH WALL WITH HEAD WALL CORNER TO CORNER TOP OUT AT 6' & 50' LF FROM CORNER OF ABOVE WEST TO 6' TOP OUT OK TO GROUT |
| 12/10/2009 | STEM WALL/RETAINING WALL | GDABBS | Approved | IVRS - Inspection :* |
| 12/11/2009 | FRAMING | GDABBS | Approved | IVRS - Inspection :* METAL STUD FRAMING @ STORE FRONT FACADE AND REAR EXIT FACADE |
| 12/11/2009 | BUILDING - PROGRESS | GDABBS | Approved | IVRS - Inspection :* |
| 12/14/2009 | ROOF NAILING | GDABBS | Approved | IVRS - Inspection :* |
| 12/17/2009 | EXCAVATION/LAYOUT REBAR & ZON | GDABBS | Approved | IVRS - Inspection :* 1) 4 LIGHT POLE BASES ON NORTH SIDE OK AND REBAR MAT AT SOUTH DRIVEWAY ENTRY OK |
| 12/17/2009 | ELECTRIC - UNDERGROUND | RJIROUDE | Approved | IVRS - Inspection :* 1) OK TELEPHONE BOARD WALL 2) OK RESTROOM WALLS 3) OK U.G. TO LAST 2 DISPENSORS SOUTH END 4) OK 4 POLE BASES NORTH AND EAST ENTRANCE |
| 12/17/2009 | ELECTRIC - PROGRESS | RJIROUDE | Approved | IVRS - Inspection :* |
| 12/17/2009 | ELECTRIC - OUTDOOR LIGHTING | RJIROUDE | Approved | IVRS - Inspection :* |
| 12/17/2009 | ELECTRIC - INTERMEDIATE | RJIROUDE | Approved | IVRS - Inspection :* |
| 12/29/2009 | PLUMBING - PROGRESS | RRICH | Approved | IVRS - Inspection :* |
| 12/30/2009 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 12/31/2009 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* 1) ALL INTERIOR WALLS-PLYWOOD IN SW AREA (EXCEPT FOR RESTROOMS WALLS) FIRE BLOCKING BETWEEN RESTROOMS-OK TO TAPE PROGRESS AREAS-PENDING ELECTRIC INTERMEDIATE |
| 12/31/2009 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* 1) 4" SDR 35 CONTINOUS THRU INLINE CLEANOUT THRU TO 45 DEGREE 5' FROM BLDG SEWER CONNECTION 2) TESTING AT LATER DATE 3) APPROVED PLAN ON SITE |
| 01/11/2010 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 03/02/2010 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* 1) OK TO SET CEILING TILES-PENDING MECHANICAL ABOVE CEILING |
| 03/03/2010 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection :* 1) INSULATE LINEAR SUPPLY BOXES-WILL CHECK AT FINAL 2) FOR FINAL PROVIDE AUDIBLE AND VISIBLE ALARMS FOR DUCT SMOKE DETECTORS 3) OK FOR CEILING TILES |
| 03/03/2010 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* |
| 03/03/2010 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
| 03/05/2010 | U VALUE FOR WINDOW | GDABBS | Approved | IVRS - Inspection :* |
| 03/05/2010 | ELECTRIC - TEMP POWER FOR TEST | RJIROUDE | Approved | IVRS - Inspection :* |
| 03/05/2010 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER R. JIROUDEK |
| 03/08/2010 | FIRE - HYDRANTS | CFUNKE | Approved | |
| 03/08/2010 | EXT METAL CLIPS/EXT SHEATHING | GDABBS | Approved | IVRS - Inspection :* |
| 03/08/2010 | BUILDING PRE-SLAB | GDABBS | Approved | IVRS - Inspection :* |
| 03/17/2010 | PLUMBING - FINAL | RRICH | Approved | IVRS - Inspection :* |
| 03/18/2010 | RIGHT OF WAY - FINAL | MCASTRO | Approved | |
| 03/18/2010 | NPPO - FINAL | ACONNOR | Approved | |
| 03/22/2010 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* AIR BALANCE & DUCT SMOKE DETECTOR TEST OK FOR FINAL. |
| 03/22/2010 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 03/23/2010 | ELECTRIC - CONSTRUCTION POWER | RJIROUDE | Approved | IVRS - Inspection :* |
| 03/23/2010 | ELECTRIC - CABLE DROP | RJIROUDE | Approved | IVRS - Inspection :* |
| 03/23/2010 | ELECTRIC - ABOVE CEILING | RJIROUDE | Approved | IVRS - Inspection :* |
| 03/24/2010 | ELECTRIC - FINAL | RJIROUDE | Approved | IVRS - Inspection :* 1) RECEIVED SPECIAL INSPECTION REPORT FOR OUTDOOR LIGHTING COMPLIANCE |
| 03/24/2010 | OUTDOOR LIGHTING FINAL | RJIROUDE | Approved | IVRS - Inspection :* |
| 03/24/2010 | SIGN - FINAL | JYBARRA | Approved | |
| 03/29/2010 | FIRE - FINAL | CFUNKE | Approved | |
| 03/29/2010 | ENGINEERING - FINAL | JFEMLING | Approved | As-builts submitted and approved |
| 03/30/2010 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |