Permit Details

Status:
Final
Type:
Grading
Apply Date:
08/21/2009
Applicant:
JIM PATTERSON
Description:
GRADING: BOOSTER STATION
Contractors:
  • INNOVA ENVIRONMENTAL ENGINEERING L L C

Permit Reviews

Permit Number - T09BU01250
Permit Status: Final
Permit Description: GRADING: BOOSTER STATION
Start Date Submittal Complete Date Status  
08/21/2009 PLANS OK TO SUBMIT - GRADING 08/21/2009 COMPLETED Review Details
08/21/2009 GRADING 08/25/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T09BU01250
Permit Status: Final
Permit Description: GRADING: BOOSTER STATION
Total Outstanding Activity Conditions - 1
Date Name
08/21/2009 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T09BU01250
Permit Description: GRADING: BOOSTER STATION
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/28/2009 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved PRECON MEETING ACCOMPLISHED. SMALL SITE < 1AC DISTURBANCE THAT CONSIST OF TRENCHING FOR INSTALLATION OF PIPE AND THE CONSTRUCTION OF A PUMP HOUSE/BOOSTER STATION.
CONTRACTOR HAS A STORM WATER PLAN AND WILL IMPLEMENT THE PLAN.
CONTRACTOR WILL PLACE TEMP SEDIMENT CONTROLS ALONG THE DOWN SLOPE SIDE OF CONSTRUCTION, MAINTAIN THOSE CONTROLS AND DOCUMENT SELF INSPECTIONS.
A CONSTRUCTION ENTRANCE WILL ALSO BE INSTALLED.
POC-DAN STRINGAM 870-6142

CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS ARE INSTALLED
09/24/2009 STORMWATER INSTALL OF CONTROLS MRUSSO Approved SEDIMENT CONTROLS HAVE BEEN INSTALLED.
MAY NEED TEMPORARY CONTROLS AROUND STOCKPILED MATERIAL.
10/27/2009 STORMWATER FOLLOW-UP INSP MRUSSO Approved NO SIGNIFICANT STORM WATER CONCERNS:
1) RE-ESTABLISH CONSTRUCTION ENTRANCE PER PLAN
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION UNTIL FINAL STABILIZATION.
3) ENSURE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
05/06/2010 GRADING - FINAL MRUSSO Approved
05/06/2010 GRADING - INTERMEDIATE MRUSSO Approved
05/06/2010 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
05/06/2010 GRADING - TIER REV MRUSSO Approved
08/23/2010 PERMIT FINALED KMEDINA Approved
06/12/2019 GRADING - REBAR RLEDONNE Approved

Documents

File Name Document Type  
001_SITE GRADING.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW