Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | PRECON MEETING ACCOMPLISHED. SMALL SITE < 1AC DISTURBANCE THAT CONSIST OF TRENCHING FOR INSTALLATION OF PIPE AND THE CONSTRUCTION OF A PUMP HOUSE/BOOSTER STATION. CONTRACTOR HAS A STORM WATER PLAN AND WILL IMPLEMENT THE PLAN. CONTRACTOR WILL PLACE TEMP SEDIMENT CONTROLS ALONG THE DOWN SLOPE SIDE OF CONSTRUCTION, MAINTAIN THOSE CONTROLS AND DOCUMENT SELF INSPECTIONS. A CONSTRUCTION ENTRANCE WILL ALSO BE INSTALLED. POC-DAN STRINGAM 870-6142 CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS ARE INSTALLED |