Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T09BU01250

Parcel: 21439022B

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
05/06/2010 STORMWATER FOLLOW-UP INSP Approved
04/06/2010 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/23/2010 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
02/02/2010 STORMWATER FOLLOW-UP INSP Continued ROCK RIP RAP CHANNEL INSTALLED - EDGE OF CHANNEL, ROCK NEEDS TO BE AT GRADE TO ALLOW WATER TO FLOW INTO CHANNEL AND NOT AROUND. CONTROL BLDG ALMOST COMPLETE, ONE TANK IN PLACE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
10/27/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS:
1) RE-ESTABLISH CONSTRUCTION ENTRANCE PER PLAN
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION UNTIL FINAL STABILIZATION.
3) ENSURE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.