Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 04/06/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/23/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
| 02/02/2010 | STORMWATER FOLLOW-UP INSP | Continued | ROCK RIP RAP CHANNEL INSTALLED - EDGE OF CHANNEL, ROCK NEEDS TO BE AT GRADE TO ALLOW WATER TO FLOW INTO CHANNEL AND NOT AROUND. CONTROL BLDG ALMOST COMPLETE, ONE TANK IN PLACE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
| 10/27/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS: 1) RE-ESTABLISH CONSTRUCTION ENTRANCE PER PLAN 2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION UNTIL FINAL STABILIZATION. 3) ENSURE SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. |