Permit: T09BU00173
Permit Details
Apply Date:
02/05/2009
Applicant:
GREG CARLSON
Description:
GRADING & SWPP
Contractors:
- EBCO GENERAL CONTRACTOR LTD
Permit Reviews
Permit Number - T09BU00173
Permit Status: Final
Permit Description: GRADING & SWPP
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/05/2009 | PLANS OK TO SUBMIT - GRADING | 02/05/2009 | COMPLETED |
02/05/2009 | GRADING | 03/02/2009 | COMPLETED |
02/05/2009 | SWPPP | 02/19/2009 | COMPLETED |
04/01/2009 | GRADING | 04/17/2009 | COMPLETED |
04/01/2009 | SWPPP | 04/10/2009 | COMPLETED |
04/20/2009 | GRADING | 08/04/2011 | COMPLETED |
08/04/2011 | REVISION - GRADING | 08/04/2011 | ACTIVE |
Completed Inspections
Permit Status: Final
Permit Number: T09BU00173
Permit Description: GRADING & SWPP
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2010 | NPPO PRE PERMIT INSPECTION | JFEMLING | Approved | Walked site with Andy C. and approved trees that were tagged for PIP and TOS. |
11/01/2010 | ENGINEERING PRE-CONSTRUCTION | JFEMLING | Approved | Held Pre-con with EBCO Construction, Mike Hollibaugh, super, 254-627-9275. Went over plans and SWPPP. Discussed pre-con form, talked about changes to plans and as-builts at the end of the project. Clearing will start on Monday 11/8/10 |
11/15/2010 | STORMWATER INSTALL OF CONTROLS | JFEMLING | Approved | Contractor has begun grading for site strom controls will be installed today, we discussed location of construction entrance and protecting existing street grate inlet. |
12/20/2010 | GRADING - TIER REV | JFEMLING | Approved | Conflict with pipe flowline at outfall to Williams Blvd and existing utilities, EOR will have to revise design. |
12/22/2010 | STORMWATER FOLLOW-UP INSP | JFEMLING | Approved | Storm controls in place and in good condition. |
12/28/2010 | GRADING - INTERMEDIATE | JFEMLING | Approved | Still no resolution to pipe conflic issue, contractor work on utilities for building pad. |
02/11/2011 | GRADING - REBAR | JFEMLING | Approved | Checked rebar for dumpster all OK. |
09/15/2011 | LANDSCAPE INSPECTION | JFEMLING | Approved | Approved |
09/15/2011 | STORMWATER FINAL INSPECTION | JFEMLING | Approved | remove waddel from strom inlet on Williams |
09/15/2011 | GRADING - CHECK FOR ACTIVITY | JFEMLING | Approved | Approved |
09/27/2011 | GRADING - FINAL | jgreen | Approved | Engineering provided both the as-built plan and the EOR certification letter for the basin. Plan and letter will be forwarded to Femling for Final grading approval then it will be added tot he Records information for the property. |