Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T09BU00173
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/15/2011 | STORMWATER FOLLOW-UP INSP | Approved | Approved | |
07/26/2011 | STORMWATER FOLLOW-UP INSP | Continued | Still need to sweep a portion of praking lot . | |
07/20/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Remove trash from site sweep parking area. | |
07/18/2011 | STORMWATER FOLLOW-UP INSP | Continued | Parking lot need to be swept for dirt. | |
07/06/2011 | STORMWATER FOLLOW-UP INSP | Continued | Contractor needs to continue to monitor dirt on pavement onsite and clean up as needed to prevent track out. | |
06/27/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | COntractor needs to sweep parking lot and install controls at off site inlets to storm drains | |
06/08/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Told contractor to provide protection and washout area for stucco contractor. | |
05/05/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Need controls around dirt stockpile on adjacent property that is being used as apart of this project. | |
04/21/2011 | STORMWATER FOLLOW-UP INSP | Continued | SWPPP controls in place and in good cond. | |
03/22/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | New construction entrance in place all other controls in good cond. | |
03/10/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Construction entrance still not replaced, contractor said it will be done today, will issue NOV tomorrow if not complete. | |
03/07/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Construction entrance being replaced today, all other controls in good cond. | |
02/28/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Need to re-establish cionst. entrance rock | |
02/11/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Paving parking lot so minor track out onto Williams Blvd, contractor will sweep at end of the day. | |
02/08/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | Minor trackout on Williams Blvd, needs to be swept up. | |
01/26/2011 | STORMWATER FOLLOW-UP INSP | Continued | Controls in place and in good shape. | |
01/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | Storm controls in place and in good shape. | |
01/05/2011 | STORMWATER FOLLOW-UP INSP | Continued | Control in good shape. | |
12/22/2010 | STORMWATER FOLLOW-UP INSP | Continued | Storm controls in place and in good condition. | |
12/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | Sotrm controls in good shape. | |
12/17/2010 | STORMWATER FOLLOW-UP INSP | Continued | Control in place and in good shape following last nights rain. | |
12/09/2010 | STORMWATER FOLLOW-UP INSP | Continued | Sotrm control are in good shape. | |
11/29/2010 | STORMWATER FOLLOW-UP INSP | Continued | stormcontrol look good, asked contractor to add straw waddel along south east entrance. |